<br /> <br /> <br /> <br /> <br /> <br />Page 4 <br />design early to enable procurement of long lead-time items, such as electrical switchgear and <br />transformers, which allows PG&E service applications to be submitted well in advance of <br />construction. Both measures are critical to meeting the Project’s December 28, 2029 target <br />operational date. <br /> <br />Owner's Representative Support Services <br />The Owner's Representative provides specialty technical expertise and independent review on <br />Zone 7's behalf through all phases of the Project, including supporting the PDB procurement, <br />reviewing design and procurement deliverables, verifying cost transpare ncy through the PDB <br />team's open-book pricing, assisting with evaluation and negotiation of the Guaranteed Maximum <br />Price, and providing construction management. <br /> <br />Under this contract, LSCE, teamed with Carollo Engineers and ESA, will provide the Owner's <br />Representative services for preliminary design, procurement of the PDB team, and CEQA <br />documentation. Authorization of the remaining Owner's Representative services to support <br />subsequent phases of the Project will be brought to the Board for consideration. <br /> <br />Owner’s Representative Services Selection <br />The consulting services for the Project were competitively procured under a Request for Proposals <br />(RFP) issued in 2024, consistent with Zone 7's Procurement Policy. The RFP encompassed both <br />the Feasibility Study (Phase I) and the subsequent design and implementation of the <br />recommended Project (Phase II), and reserved Zone 7's right to select the same firm to perform <br />Phase II services if the Project was determined to be feasible and both agencies elected to <br />proceed. <br /> <br />Proposals were evaluated in 2024 by a selection committee comprising Zone 7 and City of <br />Pleasanton staff, which selected LSCE as the best-qualified firm, with Carollo Engineers as its <br />subconsultant for conceptual engineering. Consistent with the RFP, Zone 7 requested a proposal <br />from LSCE to advance the Project through preliminary design and procurement of the PDB team. <br />LSCE's performance to date has been to Zone 7's satisfaction, and its established understanding <br />of the Project provides continuity through preliminary design and PDB procurement. Staff <br />recommends the Board authorize a new contract with LSCE for Phase II. <br /> <br />External Funding <br />Zone 7 continues to evaluate grant and other external funding opportunities that may help offset <br />project costs. The Agreement provides for Zone 7 and the City to cooperate so that the Project's <br />design, permitting, procurement, and construction support eligibility for applicable funding <br />programs. Staff will return to the Board for any authorization required to pursue such funding. <br /> <br />Page 134 of 318