My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
091526 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 2:42:57 PM
Creation date
9/9/2026 2:40:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/15/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />Page 3 <br />Summary of Project Implementation: <br />Project Background <br />The City historically met its water demand through a combination of treated water purchased <br />from Zone 7 and production from its own municipal wells. In 2022, the City detected PFAS in <br />City Wells 5, 6, and 8 and removed them from service. The City evaluated options for restoring <br />its lost production capacity, and Zone 7 and the City determined that partnering on the Project <br />would best serve the interests of both agencies. The Project will add production from the <br />Bernal Subbasin, diversifying Zone 7's groundwater supply and supporting regional reliability. <br /> <br />The Feasibility Study (LSCE, December 2025), completed jointly by Zone 7 and the City, <br />evaluated three candidate well sites and identified the recommended Project, consisting of two <br />new groundwater production wells at Tennis and Community Park and Hansen Park in <br />Pleasanton, with a combined capacity of approximately 9 million gallons per day (MGD), a <br />4,000 foot transmission main in Hopyard Road and Hansen Drive, and improvements to the <br />Zone 7 Hopyard Chloramination Facility to accommodate the additional water supply. The total <br />estimated project cost is approximately $42.3 million, which would be shared with the City <br />according to the proposed Groundwater Supply Facility Construction and Operation Agreement <br />(the Agreement). <br /> <br />Agreement and Cost Share <br />On May 20, 2026, the Board authorized the General Manager to negotiate and execute the <br />Agreement, which establishes each agency's roles, including Zone 7’s role in the design and <br />construction of the facilities, the cost-share framework, and the Project's target operational <br />date of December 28, 2029. The Agreement also identifies Zone 7 as the lead agency <br />responsible for completion of the environmental documentation to satisfy California <br />Environmental Quality Act (CEQA). <br /> <br />Project costs are shared based on the City's Groundwater Pumping Quota (3,500 acre-feet per <br />year) relative to the Project's anticipated average-year production capacity (9,700 acre-feet <br />per year), resulting in a Zone 7 cost share of 64 percent for the wells and raw groundwater <br />pipelines and 77 percent for the Hopyard Chloramination Facility upgrades. The City is <br />responsible for funding the remaining costs. <br /> <br />Project Delivery: Progressive Design-Build <br />Progressive Design-Build (PDB) is a collaborative project delivery approach in which a team <br />performs both design and construction under one contract, working with Zone 7 and its <br />Owner's Representative through all phases of the Project. PDB was selected to accelerate <br />completion and to mitigate project risks by competitively selecting contractors based on <br />qualifications and early contractor involvement in constructability reviews and value <br />engineering, while enabling competitive pricing and cost certainty through a Guaranteed <br />Maximum Price contract. PDB will also enable an accelerated schedule by completing electrical <br />Page 133 of 318