My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
091526 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 2:42:57 PM
Creation date
9/9/2026 2:40:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/15/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />• Achieving passenger safety <br />• Supporting economic competitiveness <br />• Reducing congestion <br />• Promoting innovation and reinvesting in the American family <br /> <br />The grant program identifies 14 project types eligible for funding, including new technologies, <br />smart congestion-management hardware, and vehicle-to-everything technology. Of these, the <br />City's proposed project meets four project types identified in the ATTAIN Grant: <br />• Advanced transportation management technologies <br />• Infrastructure maintenance, monitoring, and condition assessment <br />• Transportation system performance data collection, analysis, and dissemination <br />systems <br />• Integrated corridor management systems <br /> <br />Proposed Grant-Funded Project <br />The Bernal Avenue Advanced Transportation and Technology Project meets the above project <br />types by adding the following technologies at 10 intersections between Foothill Road and First <br />Street/Sunol Boulevard/Bernal Avenue, and at Valley Avenue at Fairgrounds Gate 12: <br />• AI-enabled adaptive traffic signal technology <br />• New fiber optic communications <br />• New advanced traffic controllers <br /> <br />Bernal Avenue experiences frequent, variable travel demand driven by regional congestion, <br />school traffic, and Alameda County Fairgrounds events. The proposed improvements will <br />support more responsive signal operations by upgrading communications infrastructure and by <br />replacing aging traffic signal controllers, closing existing gaps and providing reliable, <br />continuous connectivity between field equipment and the City's Traffic Operations Center for <br />real-time signal timing adjustments. AI-enabled processing at individual intersections and <br />within the central signal management system will also let signal timing respond dynamically to <br />prevailing conditions. <br /> <br />OUTREACH <br />The Citywide Signal Upgrades Project is identified in the recently-adopted Pleasanton <br />Transportation Safety Action Plan (PTSAP) and includes fiber installation, modernization of <br />aging traffic signal technology, and implementation of adaptive signal timing technology – all <br />components of the proposed project. <br /> <br />A total of 16 outreach meetings were conducted for the PTSAP prior to its adoption by City <br />Council on May 19, 2026 including stakeholder, community, and citywide meetings with civic <br />organizations. <br /> <br />FISCAL IMPACT <br />As outlined below, the submitted application was for $2,652,016, with a 20 percent local match <br />Page 21 of 318
The URL can be used to link to this page
Your browser does not support the video tag.