Laserfiche WebLink
<br /> <br /> <br />28 <br />demand mitigation measures for each level, including landscape irrigation restrictions, water <br />waste prohibitions codified in Pleasanton Municipal Code Chapter 9.30, conservation pricing <br />adjustments, and prohibitions on the use of potable water for construction activities. At the most <br />severe shortage level (Level 6), the WSCP authorizes the City to request an expansion of its <br />groundwater pumping quota from Zone 7 as a supply augmentation measure. The WSCP also <br />establishes an annual process for the City to assess potential gaps between planned water <br />supply and demand for the current year and the next potentially dry year, consistent with the <br />annual assessment requirements under CWC § 10632(a). The Plan additionally addresses <br />seismic risk, energy use reporting, and climate change considerations as mandated by <br />subsequent legislative amendment. <br /> <br />The Plan also addresses the City's groundwater supply within the regulatory framework <br />of the Sustainable Groundwater Management Act of 2014 (SGMA). The City draws groundwater <br />from the Livermore Valley Groundwater Basin (DWR Basin No. 2-10), which is designated by <br />DWR as a medium-priority basin and is therefore subject to SGMA's requirements for the <br />development and implementation of a Groundwater Sustainability Plan or Alternative <br />Groundwater Sustainability Plan. Zone 7, serving as the exclusive Groundwater Sustainability <br />Agency for the Basin, submitted an Alternative Groundwater Sustainability Plan to DWR in <br />December 2016, which was approved by DWR on July 17, 2019. Zone 7 submitted its first Five- <br />Year Periodic Evaluation of the Alternative GSP in December 2021, and DWR approved that <br />evaluation in June 2024, confirming that the Basin continues to be managed sustainably. Under <br />the Alternative GSP, Zone 7 manages the Basin through a conjunctive use strategy that <br />balances natural and artificial recharge against groundwater extraction, maintaining <br />groundwater levels within a defined operational storage band of approximately 126,000 acre- <br />feet. The City holds a groundwater pumping quota of 3,500 acre-feet per year from the Basin's <br />natural sustainable yield of 13,400 acre-feet per year; however, the City ceased production from <br />its municipal wells in November 2022 due to the detection of per- and polyfluoroalkyl <br />substances (PFAS). The City and Zone 7 are currently advancing the Joint Groundwater Wells <br />project to construct new production wells in the Bernal Subbasin outside the known PFAS <br />contamination plume, with operations anticipated by 2030. Zone 7 is also actively implementing <br />a broader PFAS management strategy, including installation of PFAS treatment systems and <br />enhanced monitoring, and continues to manage additional constituents of concern, including <br />salinity under its Salt and Nutrient Management Plan and hexavalent chromium in anticipation of <br />the SWRCB's reduced maximum contaminant level of 10 μg/L effective October 1, 2026. <br /> <br />General. The City is not aware of any environmental or regulatory issues that would <br />materially adversely impact its ability to deliver water. The City previously received a citation <br />from the California State Water Resources Control Board, Division of Drinking Water (DDW), <br />related to disinfection byproduct (DBP) levels in a limited portion of the City's water system <br />serving the Kilkare service area. The matter was localized to this service area and did not <br />impact the City's ability to provide reliable water service to its customers. The City promptly <br />implemented an operational mitigation plan that successfully reduced DBP concentrations <br />below the applicable maximum contaminant levels (MCLs). The City has maintained compliance <br />with applicable MCL requirements for multiple consecutive quarters, and DDW has recognized <br />the City's successful efforts in addressing the DBP exceedance and confirmed that the City has <br />completed the necessary actions and met the applicable requirements and directives to return <br />the water system to compliance. <br /> <br />Water Quality. The applicable drinking water standards for the Water System are <br />provided in the California Domestic Water Quality and Monitoring Regulations, Title 22 of the <br />California Administrative Code. These regulations incorporate the requirements of the U.S. <br />Page 238 of 318