My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
091526 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 2:42:57 PM
Creation date
9/9/2026 2:40:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/15/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />27 <br />Facility. Zone 7 would deliver the City’s GPQ to the City’s distribution system via its existing <br />transmission system and turnouts. To receive groundwater from Zone 7, improvements to the <br />City’s distribution system would also be required, including upsizing pipes and constructing a <br />new turnout. Improvements to the City’s distribution systems would be the sole responsibility of <br />the City. The project is estimated to be operational at the beginning of 2030. <br /> <br />Zone 7’s surface water supply from both treatment plants have been ‘non-detect’ when <br />tested for the PFAS constituents. However, some of Zone 7’s groundwater facilities have been <br />impacted by PFAS. Zone 7 has implemented multiple actions to keep its treated water supply <br />below PFAS MCLs including increasing the use of surface water, installing ion exchange PFAS <br />treatment at the Stoneridge and Chain of Lake groundwater wells, and planning for PFAS <br />treatment additions at the Mocho well fields (anticipated to start construction in late 2026). <br /> <br />2025 Urban Water Management Plan. The City’s 2025 Urban Water Management Plan <br />(UWMP) was adopted by City Council on June 2, 2026. It was prepared and adopted in <br />accordance with the Urban Water Management Planning Act (California Water Code §§ 10610– <br />10657), which requires all urban water suppliers serving more than 3,000 customers or <br />supplying more than 3,000 acre-feet of water annually to develop and update a comprehensive <br />water management plan every five years. The Plan is designed to comply with multiple <br />overlapping state regulatory frameworks, including the Water Conservation Act of 2009 (SB X7- <br />7), which mandated a 20% statewide reduction in urban per capita water use by 2020; SB 606 <br />and AB 1668, which imposed additional drought planning requirements including the inclusion of <br />a Water Shortage Contingency Plan (WSCP), Drought Risk Assessments for five consecutive <br />dry water years, and annual water supply and demand assessment reporting. The Plan must <br />also demonstrate compliance with the Sacramento-San Joaquin Delta Reform Act of 2009, <br />given the City's indirect reliance on State Water Project deliveries through Zone 7 <br /> <br />Additional regulatory obligations include compliance with state and federal drinking water <br />standards set by the EPA under the Federal Safe Drinking Water Act of 1974 and enforced in <br />California by the State Water Resources Control Board's Division of Drinking Water under Title <br />22 of the California Code of Regulations, as well as compliance with the SWRCB's water loss <br />performance standards, which require individual volumetric loss standards to be met by January <br />1, 2028. <br /> <br />The Plan's key objectives are to ensure reliable water service over a 20-year planning <br />horizon through 2045 by evaluating current and projected water supply sources against demand <br />under normal, single-dry-year, and five-consecutive-dry-year conditions. It establishes that the <br />City is well-positioned to meet all projected demands under normal and single-dry-year <br />scenarios through 2045, with a projected 10% supply shortfall arising only in the fifth year of a <br />drought beginning in 2045, which the City anticipates addressing through WSCP demand- <br />reduction measures. The Plan further supports long-term supply diversification and resilience <br />through the City's coordination with Zone 7 on supply augmentation projects, including the Delta <br />Conveyance Project, Sites Reservoir, the Chain of Lakes Conveyance System, and potable <br />reuse feasibility studies. As required by the UWMP Act, the Plan incorporates a WSCP, <br />adopted concurrently with the UWMP by separate resolution, that serves as a standalone <br />document to be engaged in the case of a water shortage event such as a drought or supply <br />interruption. The primary objective of the WSCP is to ensure the City has in place the necessary <br />resources and management responses to protect health and human safety, minimize economic <br />disruption, and preserve environmental and community assets during water supply shortages <br />and interruptions. Consistent with CWC § 10632, the WSCP utilizes the six standard shortage <br />levels, ranging from up to 10% (Level 1) to greater than 50% (Level 6), and identifies a suite of <br />Page 237 of 318
The URL can be used to link to this page
Your browser does not support the video tag.