Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />88 <br />Plan (LHMP), Title 22 and 26 of the California Code of Regulations governing <br />hazardous materials transport, and Title 19 of the California Code of <br />Regulations and Chapter 6.95 of the Health and Safety Code for site <br />remediation. <br />Additionally, the potential demolition of older buildings may expose <br />hazardous materials such as asbestos-containing material (ACM), lead- <br />based paint (LBP), mercury, and polychlorinated biphenyl (PCB) caulk. As <br />analyzed in the Prior FEIR, future demolition actions would be required to <br />adhere to applicable local, State, and federal regulations, such as those <br />listed above, in relation to handling and disposal of any hazardous <br />demolition materials, thereby reducing the potential for significant impacts. <br />Furthermore, similar to the analysis in the Prior FEIR, operation of any future <br />development on the proposed sites would be expected to include small <br />quantities of commonly used hazardous substances such as cleaning <br />solvents, paints, pesticides, fertilizers, oil, and gas. However, given the small <br />quantities and the characteristics of use (routine maintenance and <br />cleaning), use of such substances would not be considered a significant <br />hazard. <br />Further, the proposed project would be consistent with General Plan policies <br />that ensure regulation of the transportation, delivery, use, storage, and <br />disposal of hazardous materials. Therefore, impacts would be less than <br />significant. <br />Overall, the future development related to the proposed project would be <br />consistent with General Plan policies that ensure regulation of the <br />transportation, delivery, use, storage, and disposal of hazardous materials to <br />mitigate the release of hazardous materials into the environment during both <br />construction and operation. Therefore, impacts would be less than <br />significant, and the proposed project would not result in a new or more <br />severe adverse impact that was not previously identified and disclosed in the <br />Prior FEIR. No further analysis is required.