My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
PLAN1
Created:
9/10/2026 12:59 PM
Modified:
9/10/2026 12:59 PM
Text:
https://www.cityofpleasantonca.gov/our
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />134 <br />b) Water Supply <br />Would the project: Have sufficient water supplies available to serve the project and <br />reasonably foreseeable future development during normal, dry <br />and multiple dry years? <br />Summary of Prior FEIR <br />The Prior FEIR found that Zone 7’s long-term water supply projections show <br />that sustainable yield from all sources is expected to meet regional demand <br />through 2025, with sufficient buffer to accommodate drought years. The <br />City’s share of total Zone 7 demand, approximately one-third, would remain <br />proportionally stable even with population growth anticipated under <br />General Plan buildout. Although the City’s total water demand would <br />increase by 2025, this increase would remain within Zone 7’s projected <br />sustainable supply. Temporary shortages could occur during drought or <br />periods of reduced SWP deliveries, but the City’s staged water-shortage <br />contingency plan and General Plan policies promoting water conservation <br />and supply sustainability would reduce these effects. <br />Overall, cumulative development under the General Plan would not exceed <br />Zone 7’s sustainable water supply, and the City’s proportional demand would <br />remain consistent with regional projections. With existing conservation <br />measures, contingency planning, and General Plan policies in place, water <br />supply impacts associated with buildout would remain less than significant. <br />Proposed Project Analysis and Conclusion <br />The City’s groundwater supply wells (20 percent of the City’s total water <br />supply) are still currently out of commission due to polyfluoroalkyl substances <br />(PFAS) concerns. However, the City has since approved plans for the <br />construction of new groundwater wells as well as an upgrade of the existing <br />Zone 7 Hopyard Treatment Facility, which would have connection to the new <br />groundwater wells. The project is slated to complete construction in early to <br />mid-2029.13 The new groundwater supply would recover the use of the <br />decommissioned groundwater supply wells. <br />As explained in Section 2, Project Description, maximum buildout of the <br />proposed sites is within the scope of and would result in fewer housing units <br />than what was analyzed in the certified Housing Element Update FEIR. <br /> <br />13 City of Pleasanton. Joint Groundwater Wells Project. Website: https://www.cityofpleasantonca.gov/our- <br />government/pleasanton-water/joint-groundwater-wells- <br />project/#:~:text=The%20target%20completion%20date%20for,to%20operate%20are%20in%20place. Accessed <br />November 17, 2025.
The URL can be used to link to this page
Your browser does not support the video tag.