My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
PLAN1
Created:
9/10/2026 12:59 PM
Modified:
9/10/2026 12:59 PM
Text:
https://www.cityofpleasantonca.gov/assets/our-government/community
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Introduction CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />2 <br />2. There are no substantial changes with respect to the circumstances <br />under which the project is undertaken which will required major <br />revisions of the Prior FEIR or ND . . . due to the involvement of new <br />significant environmental effects or a substantial increase in the severity <br />of previously identified significant effects, and <br />3. There is no new information of substantial importance which was not <br />known and could not have been known with the exercise of <br />reasonable diligence at the time the Prior FEIR was certified as <br />complete or the ND was adopted . . . which shows any of the following: <br />a) The project will have one or more significant effects not <br />discussed in the Prior FEIR or ND; <br />b) Significant effects previously examined will be substantially <br />more severe than shown in the Prior FEIR or ND; <br />c) Mitigation measures or alternatives previously found not to be <br />feasible would in fact be feasible and would substantially <br />reduce one or more significant effects of the project, but the <br />project proponents decline to adopt the mitigation measure or <br />alternative; or <br />d) Mitigation measures or alternatives which are considerably <br />different from those analyzed in the Prior FEIR or ND would <br />substantially reduce one or more significant effects on the <br />environment, but the project proponents decline to adopt the <br />mitigation measure or alternative (CEQA Guidelines § 15162(a); <br />see also PRC § 21166). <br /> <br />The Prior FEIR is available at: <br />City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566-0802 <br /> <br />The Prior FEIR can be found in Appendix A in its entirety. In addition, the <br />response to comments and errata are available here: <br />https://www.cityofpleasantonca.gov/assets/our-government/community- <br />development/Final%20EIR%20GP%20April%202009%20-%20compressed.pdf <br /> <br />potentially substantial adverse change in any of the physical conditions within the area affected by the <br />project, including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic <br />significance . . .” (see also PRC § 21068).
The URL can be used to link to this page
Your browser does not support the video tag.