Page 2 of 3
<br />properties. The bill requires the removal of non-functional turf from all government properties
<br />by January 1, 2027.
<br />
<br />In 2024, the City conducted a citywide study to identify turf areas on City properties that do not
<br />serve a functional purpose. The study included both underutilized recreational turf and non-
<br />functional or ‘aesthetic’ turf. Staff used the study findings to develop bid documents for the
<br />replacement of identified non-functional turf.
<br />
<br />DISCUSSION
<br />The bid opening for the Nonfunctional Turf Conversion for AB1572 project, CIP No. 26787,
<br />was held on June 24, 2026, at 11:00 a.m. Eight base bids, ranging from $429,845 to $982,000,
<br />were received (Attachment 2). The lowest base bid, submitted by Westside in the amount of
<br />$429,845, is approximately 48 percent of the Engineer’s Estimate of $889,000. Although
<br />Westside’s total for the bid alternates was $397,382.50, approximately 43 percent of the
<br />Engineer’s Estimate of $936,707, staff does not recommend approval of the bid alternate work,
<br />considering the City's current budget situation. Staff reviewed the bids, found the low bid to be
<br />responsive, and recommends awarding the construction contract to Westside in the amount of
<br />$429,845.
<br />
<br /> CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
<br /> A Notice of Exemption (NOE) was filed for the turf reduction implementation under
<br />Categorical Exemption Class 2, replacement or reconstruction.
<br />
<br />EQUITY AND SUSTAINABILITY
<br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Water Use by
<br />decreasing water use and demand, and Natural Systems by fostering resilient landscapes that
<br />improve habitats, ecosystems, and public health.
<br />
<br />OUTREACH
<br />No outreach was conducted, as this item is a routine matter of City business.
<br />
<br />STRATEGIC PLAN ALIGNMENT
<br />Approval of this action advances the citywide ONE Pleasanton Strategic Plan goal of Investing
<br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP)
<br />to complete design and construction of budgeted capital projects, and Strategy 7 – Continue to
<br />invest in parks, bicycle, and pedestrian infrastructure, and public art to improve traffic safety,
<br />promote climate resilience, and increase equitable access to cultural and recreational
<br />opportunities.
<br />
<br />FISCAL IMPACT
<br />The total allocated budget of $1,100,000 for the Nonfunctional Turf Conversion for AB1572
<br />Project, CIP No. 26787, includes funding from Park CIP General Fund (Fund 221) in the
<br />amount of $850,000 and from Park Development Impact Fees (Fund 222) in the total amount
<br />of $250,000. Referring to Attachment 3, expenditures to date for this project total $67,566,
<br />including consultant costs. Anticipated expenditures in the amount of $535,211 for the
<br />construction contract, construction support, contingencies, and landscape improvements by
<br />Public Works staff, leave a project balance of $497,224 to return to the Parks CIP General
<br />Docusign Envelope ID: 379E6F4E-E7EA-8FA3-8200-F2CFCEE4481A
|