Laserfiche WebLink
Ordinance No. 2308 August 11, 2026 <br />behalf of the City or enter into an agreement whereby the City may opt to procure <br />such rights to implement the sewer design as shown. <br /> <br />Maintenance of the installed sewer network can be performed by the City <br />assuming the network is constructed according to Pleasanton standards, <br />accepted by the City Council, and incorporated into an on-going funding district <br />such as a Community Facilities District. (Condition to be fulfilled prior to final <br />improvement plan approval.) <br /> <br />53. ACCENT PAVING. Accent paving is proposed within the public road network in <br />addition to traditional hot-mix asphalt (HMA) surfacing. The type of accent <br />paving is subject to review and approval by the City Engineer to assure any <br />future maintenance of this surfacing does not burden the City’s Operations staff. <br />If the City Engineer determines that a burden will exist, the accent paving shall <br />either be removed from the project, or an alternative funding mechanism created <br />to address this potential maintenance burden. (Condition to be fulfilled prior to <br />final improvement plan approval). <br /> <br />54. CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted <br />on a plan sheet(s) in the submitted plans for construction. (Fulfill this condition <br />prior to plan approval.) <br /> <br />55. ENGINEERING DIVISION FEES FOR SERVICE: The Engineering Division <br />assesses fees for services including plan-check, permit issuance, and inspection <br />according to the City’s adopted Master Fee Schedule. These fees are separate <br />and distinct from fees assessed by the Community Development Department <br />(including Planning and Building Division fees). The Applicant is responsible for <br />payment of all Engineering Division fees prior to services rendered or permit <br />issuance, whichever is first. (Fulfill this condition prior to plan approval.) <br /> <br />56. CITY ENGINEER SIGNATURE BLOCK: The following signature block shall be <br />depicted on the first sheet of the plans submitted for construction: “Approval of <br />these plans is for work within the street right-of-way and public utility systems <br />within Public Services Easements unless otherwise noted. Approval of these <br />plans does not release the developer of the responsibility for the correction of <br />mistakes, errors, or omissions contained therein. If during the course of <br />construction of the improvements public interest requires a modification or a <br />departure from the specification and details of the City of Pleasanton or these <br />plans, the City Engineer shall have the authority to require such modification or <br />departure and to specify the manner in which same is to be made. Approved as <br />to design only based upon information submitted hereon this [DAY] of [MONTH], <br />[YEAR]. [NAME], P.E., City Engineer, [DATE] (Fulfill this condition prior to plan <br />approval.) <br /> <br />57. ADHERENCE TO CITY STANDARDS: All public improvements shall be <br />designed and constructed in conformance with the City of Pleasanton Municipal