My WebLink
|
Help
|
About
|
Sign Out
ORD 2308
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2026 11:04:41 AM
Creation date
9/18/2026 10:54:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2308
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />disposal to authorized landfills or recyclers. Erosion control features shall be <br />deployed during the rainy season that extends from October 1st to April 15th each <br />year, or any time rain is forecast outside of this period. Best Management <br />Practices (BMPs) shall be strictly followed. Street sweepers must be employed if <br />soil or debris is tracked onto the public roads from vehicles exiting the site. <br />Standard BMPs are available from the California Stormwater Quality Association <br />(CASQA), the United States Environmental Protection Agency (EPA), Caltrans, <br />and others. Notes and/or illustrations shall be added to the plans that describe <br />the BMPs to be utilized during construction. The use of manufactured erosion <br />control woven blankets and straw wattles that utilize plastic monofilament netting <br />is specifically prohibited. (Fulfill this condition during construction.) <br /> <br />89. SWPPP REPORTING: Copies of any monitoring and/or sampling reports <br />required by the stormwater pollution prevention plan (SWPPP) and submitted by <br />the Legally Responsible Person (LRP) to the State of California’s SMARTS <br />database shall also be submitted to the City of Pleasanton inspector assigned to <br />the project. The LRP shall also submit to the City a copy of the required Annual <br />Report no later than September 1st of each year that construction is active or <br />when erosion control features have been deployed. The report must include a <br />summary of all sampling and analysis performed (Risk Levels 2 and 3 only), a log <br />of all inspections performed, a summary of any required corrective actions taken, <br />and a summary of any violations. (Fulfill this condition during construction.) <br /> <br />90. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All <br />stockpiles or unused materials that can create dust shall be covered or removed. <br />Exposed soil areas shall be routinely watered until surfacing materials or <br />landscaping is installed. Use of dust palliatives shall conform to Caltrans <br />Standard Specification Section 18. Any damage caused by airborne dust to <br />neighboring properties shall be cleaned with costs paid by the Applicant. If the <br />Applicant fails the address dust as directed by the City, the City shall have the <br />right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the Applicant’s property. (Fulfill this condition <br />during construction.) <br /> <br />91. PROPERTY NUISANCE: At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal <br />Code §9.28.020. The City shall have the right to inspect the property for <br />conditions that violate the code standard. If a nuisance is found, the Applicant <br />shall immediately submit a plan of correction. Depending on the severity of the <br />nuisance, the City may suspend all construction work until the condition is <br />corrected. Any of the following conditions shall be considered severe: leaking <br />chemicals that can cause environmental damage; open excavations or any <br />excavation deeper than 4 feet that lacks proper shoring; unsecured materials that <br />can fall to the ground causing damage or injury; open or exposed utilities that <br />could cause electrical shock or contamination of sewer, potable water systems,
The URL can be used to link to this page
Your browser does not support the video tag.