My WebLink
|
Help
|
About
|
Sign Out
ORD 2308
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2026 11:04:41 AM
Creation date
9/18/2026 10:54:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2308
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />groundwater wells, or storm drainage networks. If the Applicant fails the address <br />the nuisance as directed by the City, the City shall have the right to enter the <br />property to effectuate the correction, with all costs paid by the applicant or levied <br />as a lien against the applicant’s property. (Fulfill this condition during <br />construction.) <br /> <br />92. NOISE: Construction noise is regulated under Pleasanton Municipal Code <br />Chapter 9.04. Noise is prohibited outside of the hours of 8 a.m. and 8 p.m. daily <br />except Sundays and holidays when noise is prohibited outside the hours of 10 <br />a.m. and 6 p.m. Noise is defined as a level exceeding 83 dBA at a distance of 25 <br />feet or 86 dBA at any point beyond the boundary of the property under <br />construction. If the Applicant fails to address the noise as directed by the City, <br />the City shall have the right to enter the property to effectuate the correction, with <br />all costs paid by the Applicant or levied as a lien against the Applicant’s property. <br />Exceptions to these regulations require a special permit granted by the City for <br />circumstances when strict compliance would be impractical or unreasonable, and <br />contingent upon proper noticing to surrounding property owners that includes the <br />dates and times when noise levels will be exceeded and the specific reasons <br />why an exception to the regulation has been granted. (Fulfill this condition during <br />construction.) <br /> <br />93. DROUGHT RESTRICTIONS: If the City Council declares a drought during a time <br />when this development is under construction, as described in § 9.30.010, et seq., <br />of the Pleasanton Municipal Code, the Applicant shall utilize only recycled water <br />under Stage 1 or greater restrictions for all non-potable construction-related <br />water needs. Recycled water is available at designated locations within the City, <br />subject to the Applicant’s receipt of a temporary hydrant meter from the <br />Operations Service Center located at 3333 Busch Road. The Applicant is <br />responsible for all water costs based on current billing rates. (Address this <br />condition during construction) <br /> <br />94. GEOTECHNICAL FINAL REPORT: At the conclusion of construction, the <br />Applicant shall submit to the City a final report from the Geotechnical Engineer or <br />Certified Engineering Geologist testifying to the successful completion of all <br />material testing and/or observation work performed. The final report must provide <br />assurance that all recommendations had been strictly followed. The Applicant <br />shall bear all costs associated with this condition. (Fulfill this condition prior to <br />acceptance of improvement or issuance of an Occupancy Permit.) <br /> <br />95. DAMAGE TO EXISTING PUBLIC OR PRIVATE IMPROVEMENTS: The <br />Applicant shall repair damage to existing public or private improvements on and <br />near the project site and along the haul route at the applicant’s expense if caused <br />by construction activities. (Fulfill this condition prior to acceptance of <br />improvements or issuance of an Occupancy Permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.