My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_080326
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
080326
>
_Agenda_Packet_080326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:23:28 PM
Creation date
9/24/2026 3:22:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/3/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prioritization and Implementation of Proposed Recommendations <br />for the Pleasanton Bicycle and Pedestrian Master Plan Update July 21, 2026 <br /> <br />P a g e | 5 <br /> <br />Table 3: Top 5 Ranked Pedestrian Projects <br /> <br />Overall, the recommended bicycle and pedestrian improvement program represents approximately <br />$73 million in planning-level capital improvements, consisting of $58 million in bicycle improvements <br />and $15 million in pedestrian improvements (see Table 4). <br />Table 4: Planning Level Cost of Proposed Bicycle and Pedestrian Improvements <br /> <br />Pedestrian <br />Ranking Proj ID Intersection Implementation <br />1 56 Kottinger Dr at Bernal Ave Long Term <br />2 50 Bernal Ave at Sunol Blvd Long Term <br />3 40 Santa Rita Rd at Black Ave Near Term <br />4 48 Bernal Ave at Pleasanton Ave Near Term <br />5 53 Main St at Division St Near Term <br />Project Type Number of <br />Projects Estimated Cost1 <br />Bicycle Projects 25 $57,528,300 <br />Pedestrian Projects 56 $15,260,000 <br />Total 81 $72,788,300 <br />1. The costs presented are planning-level estimates <br />intended for project prioritization and comparison. <br />Actual project costs will vary based on the final <br />scope, design, site conditions, utility requirements, <br />right-of-way needs, environmental review, and <br />construction market conditions.
The URL can be used to link to this page
Your browser does not support the video tag.