Prioritization and Implementation of Proposed Recommendations <br />for the Pleasanton Bicycle and Pedestrian Master Plan Update July 21, 2026 <br /> <br />P a g e | 4 <br /> <br />distribution of community votes across bicycle and pedestrian improvement locations is shown in <br />the heat maps included in Appendix B . <br />To develop the final prioritized project list, technical scores were first normalized on a 100 -point <br />scale and combined with normalized community vote totals. Final rankings were calculated using an <br />80 percent weighting for the technical score and a 20 per cent weighting for community preference. <br />Accordingly, project prioritization is primarily driven by objective measures such as safety, <br />connectivity, comfort, equity, and cost, while also reflecting community -identified priorities. <br />Implementation Approach <br />Projects were evaluated for implementation readiness and categorized as either near -term (0–5 <br />years) or longer-term (5+ years) to assist with funding and delivery strategies. <br /> <br />Near-Term Projects (0–5 Years) generally consist of lower-cost improvements that can be <br />implemented through signing, striping, signal timing adjustments, traffic calming measures, <br />pedestrian crossing enhancements, and quick -build treatments. These projects can often be <br />delivered through existing maintenance programs, annual capital improvement budgets, or <br />development-driven improvements and provide an opportunity to demonstrate early progress <br />toward Plan goals. <br /> <br />Long-Term Projects (5+ Years) include corridor-wide bicycle facility upgrades and intersection <br />improvements requiring design and capital investment. These projects should be incorporated into <br />the City's Capital Improvement Program (CIP), advanced through phased implementation, and <br />positioned for regional, state, and federal funding opportunities. <br />Individual Project Ranking <br />Based on the methodology described above, a technical score and ranking were developed for <br />each bicycle and pedestrian improvement project. Project rankings and implementation timelines for <br />all bicycle and pedestrian improvements are provided in Appendix D. <br /> <br />The top 5 ranked bike projects are shown in Table 2 and Appendix B, and the top five ranked <br />pedestrian projects are shown in Table 3 and Appendix B. <br /> <br />Table 2: Top 5 Ranked Bike Projects <br /> <br /> <br /> <br />Bike <br />Ranking Proj ID Corridor Segment/Intersection Implementation <br />1 24 Main St Del Valle Pkwy to St. John St Near Term <br />2 17 Santa Rita Rd I-580 to Del Valle Pkwy Long Term <br />3 22 Old Bernal Ave Bernal Ave to Peters Ave Near Term <br />4 23 Peters Ave/St. John St Main St to Old Bernal Ave Long Term <br />5 16 Valley Ave Hopyard Rd to Santa Rita Rd Long Term