My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prioritization and Implementation of Proposed Recommendations <br />for the Pleasanton Bicycle and Pedestrian Master Update August 18, 2026 <br /> <br /> <br />Off-street trails can similarly provide lower-stress alternatives to Focus Network corridors and <br />important connections between neighborhoods and destinations. Because these facilities are <br />not owned by the City, this Plan focuses primarily on the on-street bicycle and pedestrian <br />network and connections to existing and planned off-street trails. The 2019 City of Pleasanton <br />Trails Master Plan identifies recommendations for the future trail network. <br />When selecting spot improvements for near-term implementation, the City should prioritize <br />projects that close critical gaps, improve connections between existing low-stress facilities, <br />provide access to schools, parks, trails, and other key destinations, o r address documented <br />safety concerns. Where funding is limited or a larger corridor project is not yet feasible, the City <br />can also prioritize near-term improvements that connect to existing off-street trails or enhance <br />parallel local routes. These targeted improvements can provide meaningful network benefits <br />with relatively limited investment while supporting the longer-term implementation of the Vision <br />Network. <br />Bicycle and pedestrian projects identified on the Focus Network, along with project rankings and <br />recommended implementation timelines, are provided in Appendix D. The City can use this list <br />to identify opportunities for spot improvements and guide near-term investments.
The URL can be used to link to this page
Your browser does not support the video tag.