Laserfiche WebLink
Prioritization and Implementation of Proposed Recommendations <br />for the Pleasanton Bicycle and Pedestrian Master Update August 18, 2026 <br /> <br /> <br />Major Capital Corridors <br />Major Capital Corridors are important citywide and regional connections that require substantial <br />infrastructure investment and complex implementation. Due to their scale and cost, these <br />corridors are best advanced through phased planning and design, coordination with partner <br />agencies, and pursuit of competitive regional, state, and federal funding opportunities. While <br />these corridors ranked lower than the Priority Corridors, they remain important long-term <br />investments for improving the city's multimodal transportation network. <br /> <br />Major Capital Corridors include: <br /> <br />• #10 Foothill Road <br />• #11 Stoneridge Drive <br />• #12 Hopyard Road <br />• #14 Willow Road <br />• #15 Iron Horse Trail Extension <br />Opportunity Corridors <br />Opportunity Corridors represent corridors where improvements can be advanced through <br />smaller-scale capital projects, routine maintenance, development-related improvements, or <br />other opportunistic funding sources. While these corridors may not require the level of <br />investment needed for the Priority or Major Capital Corridors, they can provide meaningful near- <br />term safety and connectivity benefits and help expand the City's low-stress bicycle and <br />pedestrian network as opportunities arise. <br /> <br />Opportunity corridors include: <br /> <br />• #6 Black Avenue <br />• #7 Case Avenue <br />• #8 Greenwood Road/Harvest Road <br />• #13 Dorman Road <br />• #16 Stoneridge Mall Road <br />• #17 Owens Drive <br />Spot Improvement Opportunities <br />In addition to corridor-level investments, individual bicycle and pedestrian improvements can be <br />implemented independently as “one-better” level-of-traffic-stress upgrades through resurfacing <br />projects, capital improvement projects, utility work, and other planned improvements. These <br />opportunities include intersection crossing improvements, sidewalk gap closures, bicycle <br />network connections, and connections between the on-street network and existing off-street <br />trails. Advancing these improvements incrementally can address critical gaps, improve safety <br />and accessibility, and expand the City’s low-stress walking and bicycling network while larger <br />corridor projects are being planned, designed, and funded. <br />The Vision Network identifies the desired long-term citywide bicycle and pedestrian network but <br />does not capture every street that may function as a lower-stress alternative to a major <br />roadway. In particular, parallel local streets can provide important walking and bicycling routes <br />even when they are not identified as part of the Vision Network. These streets can complement <br />major corridor improvements by providing lower-stress alternatives and neighborhood <br />connections.