Laserfiche WebLink
2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN | 31 <br />EXISTING CONDITIONS AND NETWORK EVALUATION <br />Pleasanton has an extensive network of sidewalks, bikeways, and shared-use trails that provide connections throughout the com- <br />munity. However, major arterial roadways, high traffic speeds, and challenging crossings continue to create barriers to comfortable <br />and convenient walking and bicycling. This chapter documents existing conditions, evaluates the performance of the existing active <br />transportation network, and identifies the safety, comfort, and connectivity needs that form the basis for the recommendations pre- <br />sented in Chapter 4. <br />Examples of Network Barriers: <br />A. Wide Crossing B. High Speed Arterials C.Freeway Crossings D. Network Gaps <br />A. <br />B. <br />C.D.