Laserfiche WebLink
32 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />EXISTING CONDITIONS AND NETWORK EVALUATION <br />Existing Conditions <br />Bicycle Network <br />Pleasanton’s bicycle network includes a combi- <br />nation of off-street trails, on-street bicycle lanes, <br />neighborhood bike routes, and separated bike- <br />ways. The City’s extensive trail system provides <br />many comfortable, low-stress connections, while <br />on-street facilities vary considerably in quali- <br />ty depending on roadway characteristics. The <br />bikeway network is particularly well connected in <br />the north-central part of the city, near the Dub- <br />lin-Pleasanton BART Station. In total, there are <br />approximately 64 miles of bikeways, including: <br />• 13 miles of Class I shared-use paths <br />• 32 miles of Class II bicycle lanes <br />• 9 miles of Class II buffered bicycle lanes <br />• 7 miles of Class III bike routes <br />• 3 miles of Class IV separated bicycle lanes <br />Pleasanton’s network of Class I and unpaved shared-use paths provides comfortable, off-street routes for bicyclists and pedestrians <br />and creates low-stress connections across major barriers, including grade-separated crossings beneath Valley Avenue, Hopyard <br />Road, Stoneridge Drive, Santa Rita Road, and I-680. <br />Although Pleasanton has a relatively comprehensive bicycle network, many key destinations remain connected by higher-speed <br />arterial roadways where bicycling can be uncomfortable for many users. <br />Figure 3 depicts the existing network of bicycle facilities in Pleasanton. <br />Source: Caltrans, Toward an Active California, State Bicycle and Pedestrian Plan, 2017.