Laserfiche WebLink
56 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />RECOMMENDED NETWORK IMPROVEMENTS <br />ID Street Extent N/W Extent S/E Recommendation <br />21 Case Ave Bernal Ave Valley Ave <br />Convert northbound Class II bike lanes <br />to Class IV separated bike lane. Convert <br />southbound Class IV separated bike lane to <br />permanent materials. <br />22 Old Bernal Ave4 Bernal Ave Peters Ave Class I shared-use path <br />23 Peters Ave/St. John <br />St Main St Old Bernal Ave Class IV separated bikeway <br />24 Main St Del Valle Pkwy St. John St <br />Class IV separated bikeway on west side <br />(to connect to St. John St recommended <br />bikeway) <br />25 Spring Ave/Kottinger <br />Dr Main St Concord St <br />Retain existing Class I shared-use path <br />and install class III bike boulevard along full <br />segment. <br />4 Old Bernal Ave along with Peters Ave/St. John St are not part of the focus network but are included as part of the recommended network because they <br /> provide an alternate route to the Main St focus network segment <br />Table 3: Bicycle Network Recommendations (Cont.)