My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - UTILITY AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - UTILITY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2026 2:18:51 PM
Creation date
9/28/2026 2:17:41 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
9/4/1990
LONG TERM AGREEMENTS - NAME
PACIFIC GAS AND ELECTRIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITY AGREEMENT NO. 788.7 <br />CITY OF PLEASANTON <br />PLEASANTON, CALIFORNIA <br />AND <br />PACIFIC BELL <br />DATE November 6, 1990 <br />CITY OF PLEASANTON, hereinafter called CITY proposes to construct a <br />freeway Interchange in Pleasanton at Santa Rita Road at I-580 and PACIFIC <br />BELL hereinafter called OWNER, proposes to install new telephone facilities <br />within the limits of CITY's project. <br />It is hereby mutually agreed that: <br />I. WORK TO BE DONE <br />The CITY shall install six new 4-inch galvanized steel telephone conduits in the <br />Santa Rita Road/I-580 overcrossing structure for use by the OWNER to install <br />future telephone lines. All work shall be performed substantially in accordance <br />with the CITY's plans and specifications, a copy of which is on file in the City <br />Engineer's office at 200 Old Bernal Road, Pleasanton, California 94566. Minor <br />deviations from the above -described work may be made and incidental work <br />performed by the CITY when mutually acceptable to both parties and upon <br />approval by the OWNER. <br />II. LIABILITY FOR WORK <br />Installation of the facilities described in I above will be at 100 percent OWNER <br />expense. <br />PACIFIC BELL Liability, 100% $2000.00 <br />Total Estimated Cost $20,000.00 <br />III. TIME AND PERFORMANCE OF WORK <br />CITY agrees to perform the herein -described work with its CONTRACTOR and <br />to provide and furnish all necessary labor, materials, tools, and equipment <br />required therefor, and to prosecute said work diligently to completion by <br />December 1, 1990 or as otherwise agreed with CITY's representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.