My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10-6-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
100626 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10-6-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 9:31:14 AM
Creation date
9/30/2026 9:30:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/6/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Item #3 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />October 6, 2026 <br />Public Works - Engineering Division <br /> <br />TITLE: ADOPT A RESOLUTION APPROVING A CONTRACT WITH TELSTAR <br />INSTRUMENTS, INC, FOR THE EMERGENCY GENERATOR REPLACEMENT <br />PROJECT, IN THE AMOUNT OF $2,747,681 WITH A 15 PERCENT <br />CONTINGENCY OF $412,152, AND AUTHORIZE THE CITY MANAGER TO <br />EXECUTE THE AGREEMENT <br /> <br />SUMMARY <br />The Emergency Generator Replacement Project includes the purchase and installation of <br />permanent standby emergency generators at five pump stations, including three water booster <br />stations and two sewer lift stations. Wood Rodgers, Inc., designed the project. <br /> <br />A competitive bidding process was conducted in accordance with the City’s procurement and <br />contracting procedures. Eight bids were received on September 2, 2026. Staff recommends <br />that the City Council authorize the City Manager to execute a construction contract with Telstar <br />Instruments, the lowest responsive bidder, in the amount of $2,747,681 for the base bid <br />amount. Staff also recommends authorizing a construction contingency of $412,152, or <br />approximately 15 percent, for related work, for a total authorized construction budget of <br />$3,159,833. Construction is anticipated to begin in November 2026 and be completed by early <br />2028. <br /> <br />BACKGROUND <br />A Preliminary Design and Standby Power Planning Study, completed in November 2023, <br />assessed emergency generators serving the City’s water, sewer, and storm drain networks. <br />The study recommended systemwide improvements based on the age and condition of <br />existing standby generators and the lack of suitable infrastructure to accommodate portable <br />generators. The project will improve five sites by installing permanent standby generators to <br />maintain reliable operations during power outages, thus reducing risks to public health, safety, <br />and the environment if the pump stations are inoperable. <br /> <br />DISCUSSION <br />The City is increasingly vulnerable to power disruptions due to Public Safety Power Shutoffs <br />(PSPS), unplanned outages related to aging utility infrastructure, or extreme weather events. If <br />a critical system were to fail without backup power, the consequences could carry significant <br />environmental, financial, and legal risks, as well as direct impacts to residents and businesses. <br /> <br />The City operates 22 pump stations within the water distribution and sewer collection <br />networks. Each station either has a permanent standby emergency generator or can <br />accommodate a portable generator if normal electric service is interrupted. Emergency <br />generators ensure that vital services—including water and sewer pump stations—remain <br />operational. Investing in emergency generators reduces the City's operational risk, improves <br />system resilience, and demonstrates the City’s commitment to emergency preparedness and <br />Page 17 of 46
The URL can be used to link to this page
Your browser does not support the video tag.