Laserfiche WebLink
Page 2 of 3 <br />sustainable service delivery. It also aligns with the City's broader goals of infrastructure <br />reliability, environmental compliance, and continuity of government operations. <br /> <br />Wood Rodgers, Inc., provided design services for the replacement and upgrade of emergency <br />power systems at five of the City’s 22 existing pump stations. The Preliminary Design and <br />Standby Power Planning Study identified improvements to several other remaining facilities, <br />which will be addressed as budget becomes available and approved. The following five sites <br />are included in the current Emergency Generator Replacement Project (Attachment 1): <br />1. Laurel Creek Water Booster Station <br />2. 900 Santos Water Booster Station <br />3. 1300 Santos Water Booster Station <br />4. S-7 Sewer Lift Station <br />5. S-12 Sewer Lift Station <br /> <br />The bid opening for the Emergency Generator Replacement Project was held on September 2, <br />2026, at 11:00 a.m. Eight base bids, ranging from $2,747,681 to $6,160,690, were received <br />(Attachment 2). The lowest base bid, submitted by Telstar Instruments in the amount of <br />$2,747,681, is approximately 88 percent of the Engineer’s estimate of $3,132,090. Staff <br />reviewed the bids, found the low bid to be responsive, and recommends awarding the <br />construction contract to Telstar Instruments in the amount of $2,747,681. <br /> <br /> EQUITY AND SUSTAINABILITY <br /> Approval of this action advances the City's equity and sustainability goals identified in the <br />Climate Action Plan 2.0 related to community resilience and well-being by improving <br />public services to ensure all communities are prepared for climate-related impacts. <br /> <br />OUTREACH <br />No outreach was conducted, as this item is a routine matter of City business. Construction <br />notices will be sent to properties adjacent to the project locations before construction begins. <br /> <br />FISCAL IMPACT <br />The total low bid amount for the construction contract with Telstar Instruments is $2,747,681. <br />Together with a construction contingency of $412,152, the total authorized construction budget <br />is $3,159,833. <br /> <br />The project will be funded with $2,106,553 from CIP Nos. 26162 and 27162 (Water CIP <br />Replacement Fund 421) and $1,053,278 from CIP No. 26250 (Sewer CIP Replacement Fund <br />431). The Water CIP Replacement Fund 421 and Sewer CIP Replacement Fund 431 accounts <br />supporting this project have a combined approved budget of $6,522,000. <br /> <br />Current expenditures for design, surveying, permits, and miscellaneous expenses total <br />$250,225, leaving a remaining balance of $6,271,775. This balance is sufficient to fund the <br />Telstar Instruments construction contract and contingency, as well as future anticipated <br />expenditures, including engineering services during construction, construction management <br />and inspection, and other professional services. <br /> <br />Page 18 of 46