Laserfiche WebLink
PC Resolution No. PC-2026-26 September 23, 2026 <br />h. Unpaved roads providing access to sites located 100 feet or further from a <br />paved road shall be treated with a 6- to 12-inch layer of compacted layer <br />of wood chips, mulch, or gravel. <br />i. Publicly visible signs shall be posted with the telephone number and name <br />of the person to contact at the lead agency regarding dust complaints. <br />This person shall respond and take corrective action within 48 hours. The <br />Air District’s General Air Pollution Complaints number shall also be visible <br />to ensure compliance with applicable regulations. Project Specific <br />Condition <br /> <br />Construction Practices and Noticing <br /> <br />26. WORK HOURS: All demolition and construction activities, inspections, plan <br />checking, material delivery, staff assignment or coordination, etc., shall be limited <br />to the hours of 8 a.m. to 5 p.m., Monday through Friday. No construction shall be <br />allowed on State or Federal Holidays or Saturdays or Sundays. The Director of <br />Community and Economic Development may allow earlier “start times” or later <br />“stop times” for specific construction activities, e.g., concrete pouring. All <br />construction equipment shall meet Department of Motor Vehicles (“DMV”) noise <br />standards and shall be equipped with muffling devices. Prior to construction, the <br />hours of construction shall be posted on site. <br /> <br />27. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other <br />similar vehicles are not allowed on the construction site except when needed as <br />sleeping quarters for a security guard subject to receipt of a temporary <br />conditional use permit (per PMC 18.116.010.E). <br /> <br />28. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be <br />placed on the Project site for daily administration/coordination purposes during <br />the construction period. <br /> <br />29. CONSTRUCTION PARKING MANAGEMENT PLAN: The Applicant shall prepare <br />a construction parking management plan to address construction parking <br />demands during the construction phase of the Project. The construction parking <br />management plan shall be subject to the review and approval by the City Traffic <br />Engineer and Director of Community and Economic Development prior to <br />issuance of a grading permit or the first building permit, whichever comes first. <br />The following items shall be incorporated into the construction and parking <br />management plan: <br /> <br />a. Show truck route for construction and delivery trucks that does not <br />include neighborhood residential streets, unless approved by the City <br />Traffic Engineer. <br />b. Show construction vehicles and equipment parking area, materials <br />storage, temporary fencing, construction trailer location, and construction <br />Docusign Envelope ID: A549EA74-ED4F-8CB2-8262-A310230CC465