My WebLink
|
Help
|
About
|
Sign Out
PC-2026-26
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 2:24:36 PM
Creation date
9/30/2026 2:24:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/23/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Resolution No. PC-2026-26 September 23, 2026 <br /> <br /> <br /> <br />Recycling and Composting <br /> <br />22. RECYCLING AND COMPOSTING PROGRAMS: The Project shall comply with <br />the current City/Pleasanton Garbage Service recycling and composting <br />programs. <br /> <br />Green Building and Sustainability Measures <br /> <br />23. CLIMATE ACTION PLAN (“CAP”) 2.0 COMPLIANCE: The Project <br />shall comply with CAP 2.0 requirements of providing a battery storage backup <br />system. Prior to building permit issuance for the first residential building, a GHG <br />Emission Compliance Checklist shall be provided in compliance with CAP 2.0 to <br />the Planning Division for review and approval by the Director of Community and <br />Economic Development. The measures shall be shown on the building permit <br />plans submitted to the Building and Safety Division. The Checklist shall include <br />notation indicating the sheet(s) the measure can be found. Prior to the relevant <br />building permit final, all of the relevant measures indicated on the approved <br />checklist shall be inspected and approved by the City of Pleasanton. <br /> <br />24. GREEN BUILDING; The applicant shall submit GreenPoint Rated Checklist from <br />BuildItGreen.org: (https://archive.builditgreen.org/greenpoint-rated/documents- <br />checklists) and is subject to review and approval by the Director of Community <br />and Economic Development prior to issuance of a building permit. <br /> <br />25. Prior to the issuance of a grading or building permit, the project applicant shall <br />submit an air quality construction plan that includes BAAQMD basic Best <br />Management Practices, including but not limited to: <br />a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded <br />areas, and unpaved access roads) shall be watered two times per day. <br />b. All haul trucks transporting soil, sand, or other loose material off-site shall <br />be covered. <br />c. All visible mud or dirt track-out onto adjacent public roads shall be <br />removed using wet power vacuum street sweepers at least once per day. <br />The use of dry power sweeping is prohibited. <br />d. All vehicle speeds on unpaved roads shall be limited to 15 miles per hour <br />(mph). <br />e. All roadways, driveways, and sidewalks to be paved shall be completed as <br />soon as possible. Building pads shall be laid as soon as possible after <br />grading unless seeding or soil binders are used. <br />f. All excavation, grading, and/or demolition activities shall be suspended <br />when average wind speeds exceed 20 mph. <br />g. All trucks and equipment, including their tires, shall be washed off prior to <br />leaving the site. <br />Docusign Envelope ID: A549EA74-ED4F-8CB2-8262-A310230CC465
The URL can be used to link to this page
Your browser does not support the video tag.