My WebLink
|
Help
|
About
|
Sign Out
PC-2026-26
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 2:24:36 PM
Creation date
9/30/2026 2:24:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/23/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Resolution No. PC-2026-26 September 23, 2026 <br />34. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall <br />pay the applicable Zone 7 and City connection fees and water meter cost for any <br />water meters and irrigation meters, if applicable, prior to building permit issuance. <br /> <br />35. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon <br />Services District (DSRSD) and City sewer permit fees prior to building permit <br />issuance. <br /> <br />36. SCHOOL IMPACT FEES – RESIDENTIAL NEW CONSTRUCTION: Applicant <br />shall work with the Pleasanton Unified School District (PUSD) to develop a <br />program to offset this project’s long-term effect on school facility needs in <br />Pleasanton. This program shall be designed to fund school facilities necessary to <br />offset this project’s reasonably related effect on the long-term need for expanded <br />school facilities. The method and manner for the provision of these funds and/or <br />facilities shall be approved by the PUSD and in place prior to building permit <br />issuance. Written proof of compliance with this condition shall be provided by the <br />applicant to the City, on a form generated by the PUSD, prior to building permit <br />issuance. <br /> <br />BUILDING AND SAFETY DIVISION – 925-931-5300 <br /> <br />37. BUILDING SURVEY: The Applicant shall submit a building survey and/or record <br />of survey and a site development plan in accordance with the provisions of <br />Chapter 18.68 of the PMC. These plans shall be approved by the Chief Building <br />Official prior to building permit issuance. The site development plan shall include <br />all required information to design and construct site, grading, paving, drainage, <br />and utilities. <br /> <br />38. PAD AND SETBACK CERTIFICATION: The Applicant shall submit a pad <br />elevation certification prepared by a California licensed land surveyor or <br />registered civil engineer to the Chief Building Official and Director of Community <br />and Economic Development certifying the pad elevations and building locations <br />(setbacks) conform to the approved plans, prior to receiving a foundation <br />inspection for the structures. <br /> <br />39. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the Project site <br />shall be off-hauled from the site and disposed of in a lawful manner. No <br />temporary stockpiling of dirt on the Project site shall occur without the specific <br />review and approval by the Director of Community and Economic Development <br />or unless approved as part of a grading permit. Notwithstanding anything to the <br />contrary in the foregoing, on-site surcharging that is necessary to allow for the <br />proposed geotechnical remediation shall be permitted, provided that it is subject <br />to a valid permit. Project Specific Condition <br /> <br />PUBLIC WORKS DEPARTMENT – 925-931-5650 <br />Project Specific Conditions of Approval: <br />Docusign Envelope ID: A549EA74-ED4F-8CB2-8262-A310230CC465
The URL can be used to link to this page
Your browser does not support the video tag.