My WebLink
|
Help
|
About
|
Sign Out
PC-2026-26
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 2:24:36 PM
Creation date
9/30/2026 2:24:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/23/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Resolution No. PC-2026-26 September 23, 2026 <br /> (Address this condition prior to plan approval) <br /> <br />44. SANITARY SEWER. It is assumed that the existing property on the Designated <br />Remainder is served by an on-site septic sewer system. The applicant shall <br />provide one of the following documents: <br />a. Plans that show how the existing property will tie to the new sanitary sewer <br />system to be installed with the subdivision, or <br />b. An inspection report from a licensed contractor confirming that the existing <br />septic system is currently operating in a safe and healthy manner per <br />Pleasanton Municipal Code §15.16.020C. <br /> (Address this condition prior to plan approval) <br /> <br />45. CLEAN WATER PROGRAM (LARGE PROJECTS): Because the project creates <br />and/or replaces more than 5,000 square feet (0.11 acres) of impervious surface, <br />it is considered a Regulated Project according to Provision C.3.b of the Municipal <br />Regional Stormwater NPDES Permit that regulates stormwater runoff in Alameda <br />County. The Alameda Countywide Clean Water Program developed a C.3 <br />Guidance Manual to assist applicants in addressing these regulations. The <br />Guidance Manual is available for download at: <br /> <br />https://www.cleanwaterprogram.org/businesses/development.html <br /> <br />Regulated projects must include stormwater treatment measures in the site <br />design to remove pollutants from stormwater upstream of any connection to the <br />City’s or Alameda County’s stormwater conveyance networks. (Address this <br />condition prior to plan approval) <br /> <br />46. OPERATION AND MAINTENANCE AGREEMENT: Regulated projects are <br />subject to a Stormwater Treatment Measure Maintenance Agreement between the <br />City and property owner to assure long-term maintenance of the installed <br />measures. The City will provide a template agreement. Once executed, the <br />agreement must be recorded against the property. (Address this condition prior to <br />project acceptance) <br /> <br />47. BROZOSKY HILL LANE CLEAR RECOVERY ZONE (CRZ): The current design <br />of Brozosky Hill Lane will allow errant vehicles to leave the road surface and <br />descend a steep slope to the adjacent ephemeral channel. This condition exists <br />because the road lacks a clear recovery zone along the shoulder as defined by <br />AASHTO and Caltrans. As such, a W-beam type Midwest Guardrail System <br />(MGS) shall be installed along the south side of the road between Old Vineyard <br />Avenue and the Shared Driveway. Design of the MGS shall conform to the <br />requirements contained in the Traffic Safety Systems Guidance manual published <br />by Caltrans as well as Caltrans Standard Plan A77. Installation of the MGS may <br />require construction of a retaining wall along the south road edge. A typical cross- <br />Docusign Envelope ID: A549EA74-ED4F-8CB2-8262-A310230CC465
The URL can be used to link to this page
Your browser does not support the video tag.