My WebLink
|
Help
|
About
|
Sign Out
SCHUERING ZIMMERMAN & DOYLE
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SCHUERING ZIMMERMAN & DOYLE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 2:48:38 PM
Creation date
10/7/2026 2:47:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
11/22/2021
LONG TERM AGREEMENTS - NAME
SCHUERING ZIMMERMAN & DOYLE
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
ENCROACHMENT AGREEME
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Any work or use done under the Encroachment Permit shall conform to the <br />standards and specifications established by the City. In the absence of specific standards and <br />specifications, recognized standards of construction or approved practices shall govern the work <br />or use. <br />e. If, in the reasonable judgment of the City Engineer or his or her designee, <br />Consultant has failed to maintain properly the Project as required by this Agreement, the City <br />may perform such maintenance, at its option, after ten (10) days' prior written notice to Consultant <br />of such failure to maintain. Notices required hereunder shall be deemed effective two (2) days <br />after mailing. In such event, the City's performance of such maintenance shall be at the <br />Consultant's sole expense and Consultant, upon demand by the City, shall pay to the City all <br />reasonable expenses incurred by the City in the performance of such maintenance. The City's <br />remedy provided in this paragraph shall be in addition to any other rights and remedies the City <br />may have at law or in equity. If any maintenance, repair, or replacement of the Project needs <br />immediate correction as a result of a public safety or health hazard, as reasonably determined by <br />the City Engineer or his or her designee, and such maintenance is not performed, or cannot be <br />performed, by Consultant within twenty-four (24) hours of receipt of such notice thereof, which <br />notice may be sent by email or facsimile, the City may perform or cause to be performed such <br />immediate maintenance at Consultant's expense, and Consultant, upon demand by the City, shall <br />pay to the City all reasonable expenses incurred by the City in the performance of such immediate <br />maintenance. <br />f. The City, SZD and Consultant agree that for Project installation, inspection, <br />maintenance and repair work, the City shall consider Consultant as the responsible parry to <br />complete such work. <br />3. CITY'S NON -RESPONSIBILITY. Notwithstanding Section 2.e., above, City shall at <br />no time and for no reason be responsible for the repair, inspection, maintenance or replacement of <br />the Project. <br />4. TERMINATION. City may terminate this Agreement for any reason at the City's sole <br />discretion by providing ninety (90) days written notice to SZD and Consultant <br />5. REMOVAL OF PROJECT AND RESTORATION. <br />a. Upon termination, Consultant shall remove the Project from the Right of Way, <br />PSE, and public parks and shall restore, to the City's reasonable satisfaction, the Right of Way, <br />PSE, public parks and any adjacent property which has been affected by the Project to as good a <br />condition as they were in at the time of the construction of the Project. This shall include, but not <br />be limited to: (i) plugging of the monitoring well holes in the Right of Way and PSE as require by <br />Zone 7 Seal Requirements, or other material approved by the City, to thirty one feet (31') in <br />depth; (ii) road restoration; (iii) plugging of the monitoring well holes in public parks as require <br />by Zone 7 Seal Requirements, or other material approved by the City, with the top eighteen <br />inches (18") native soil; and (iv) posting a one (1) year maintenance bond (or cash bond) to <br />guaranty against defects and faults in materials and workmanship of such removal and restoration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.