Laserfiche WebLink
1. Consultant shall post a performance bond with the City to guarantee <br />monitoring well plugging and surface restoration at the termination of this Agreement in <br />generally the form as shown in the attached Exhibit B, subject to modification in the <br />reasonable satisfaction of the City Engineer or his or her designee, and the City Attorney. <br />The obligation secured by the performance bond shall be continuous in form, and only <br />exonerated and released upon: (i) City's acceptance of Consultant's plugging of <br />monitoring well holes and surface restoration; or (ii) Consultant substitutes another <br />acceptable security as determined by the City Engineer or his or her designee. <br />2. Consultant shall warrant all monitoring well plugging and surface restoration done <br />under this Agreement against all defects in materials and workmanship for a period of 12 months <br />following City's acceptance. If any defects occur within said 12 months, Consultant shall be <br />solely responsible for the correction of those defects. <br />b. Consultant hereby acknowledges that abandonments or removals can be regulated <br />by Alameda County Public Works Agency, Alameda County Flood Control and Water <br />Conservation District - Zone 7, and the Regional Water Quality Control Board, and all work shall <br />also be subject to and predicated on receipt of permits issued by these agencies, as applicable. <br />C. Except under emergency circumstances, in which the timeframe for the removal of <br />the Project and the restoration of the Right of Way, PSE, public parks and any adjacent property <br />shall be determined by City, Consultant shall remove the Project and restore the Right of Way, <br />PSE, public parks and any adjacent property within sixty (60) days after: (a) the above -referenced <br />San Francisco Bay Regional Water Quality Control Board (RWQCB) case has been completed <br />and no further monitoring is required by the RWQCB; or (b) written notice has been sent by City <br />to SZD and Consultant. <br />d. If Consultant abandons the Project, if Consultant fails to remove the Project <br />pursuant to this Agreement or the City's instructions, or Consultant fails to restore, to the City's <br />reasonable satisfaction, the Right of Way, PSE, public parks or any adjacent property which has <br />been affected by the Project to as good a condition as they were in at the time of the construction <br />of the Project, City may cause the removal of the Project and the restoration of the Right of Way, <br />PSE, public parks and any adjacent property which has been affected by the Project, at the sole <br />expense of Consultant. City shall in no manner be liable to SZD or Consultant for any damage <br />sustained by SZD or Consultant, and such removal or restoration shall in no manner prejudice or <br />impair any right of action for damages, or otherwise, that City may have against Consultant. <br />e. The City, SZD and Consultant agree that for Project removal and restoration, the <br />City shall consider Consultant as the responsible party to complete such work. <br />6. NO INTERFERENCE WITH CITY'S OPERATION. <br />a. The Project shall be constructed, installed, maintained, repaired and operated in <br />such manner as to cause no interference with the constant, continuous and uninterrupted use of <br />the Right of Way, PSE, and public parks and Consultant shall do nothing to impair the safety <br />thereof. Consultant shall not interfere with any existing City or public utility or other City system <br />.19 <br />