Laserfiche WebLink
DocuSign Envelope ID: BE74E31 B-F73A-4A434 38D4E6CBC6F5 <br />The proposed pad elevations range from 446 feet to 594 feet. According to the City's Water Distribution <br />System Master Plan Update (November 2004), the water pressure at all building pads must be 40 psi or <br />more during peak hour demand. Additionally the fire marshal has stated that the fire hydrant flow for <br />the Project must be 1,500 gallons per minute. It is currently believed that the Project will be served by <br />the Dublin Canyon water pressure zone and the Moller 770 water pressure zone. <br />For the CECI.A review, Ninyo & Moore will review the applicant's evaluation of water supply and <br />distribution and associated recommendations for system improvements. FCS will evaluate impacts on <br />public service and utility providers and evaluate the proposed projects impacts in terms of the need to <br />construct new or expanded existing facilities, acquire additional supplies, generate effluent that exceeds <br />the permitted capacity, etc_ FCS will use information provided by the applicant about proposed utility <br />demands and facilities. For other areas, FCS information provided by the City of Pleasanton and <br />service/utility providers about service levels, the adequacy of existing infrastructure, and similar topics. <br />WRECO will review the Project plans for the water main and sanitary sewer systems being prepared by <br />the applicant. The review will be to check for conformance to regulatory requirements and City <br />standards. <br />Transportation <br />As noted in the RFP, TJKM, will prepare a traffic impact analysis for use in preparing the EIR. Accordingly, <br />FCS will summarize the analysis and will include any recommendations as mitigation measures. The <br />following activities are proposed by TJKM: <br />1. Existing conditions <br />a. Conduct field review of traffic conditions and field conditions <br />b. Obtain a.m. and p.m. peak hour counts at study intersections <br />• Dublin Canyon Road at Schaefer Ranch Road <br />• Dublin Canyon Road at Canyon Creek/East Project access <br />• Dublin Canyon Road at Canyon Meadows entrance <br />• Dublin Canyon Road at Foothill Road <br />• Foothill Road at 1-580 EB ramps <br />• Foothill Road at 1-580 WB ramps <br />• Foothill Road at Stoneridge Drive <br />• Stoneridge Drive at Stoneridge Mall Road <br />• Stoneridge Drive at 1-680 SB ramps <br />• Stoneridge Drive at 1-680 NB ramps <br />c. Obtain 24 hour counts on Dublin Canyon Road near project site <br />d. Calculate existing a.m. and p.m, level of service at study intersections <br />e. Evaluate collision history on Dublin Canyon Road near project site <br />2. Project conditions <br />a. Determine trip generation for both residential and EBRP staging areas <br />b. Determine trip distribution and assignment for project traffic <br />c. Calculate intersection LOS conditions for the following scenarios <br />NW MAM1ENKA I EUROM IAFW-A I ALJ5-J[A IG I AiU1 <br />FIMCARBONSOLUTIONS.COM <br />