My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BE74E31B-F73A-4A43-F ?8D4E6CBC6F5 <br />• Existing <br />• Existing plus project <br />• Existing plus background (approved & pending projects) <br />• Existing plus background plus project <br />• Cumulative <br />• Cumulative plus project <br />Calculate daily forecasts on Dublin Canyon Road for above scenarios <br />3. Site circulation and related issues <br />a. Evaluate pedestrian, bicycle and transit impacts related to the project. <br />b. Evaluate adequacy of circulation and parking for residential site and EBRP staging area. <br />c. Provide conceptual recommendations for striping and signing along Dublin Canyon Road <br />near the project. Indicate where, if any, pavement widening is required to accommodate any <br />revised striping. Consider both project traffic issues and collision history in the area. <br />d. Determine project -related VMT. <br />4. Report <br />a. Using City of Pleasanton significance criteria, determine any significant impacts and appropriate <br />mitigation measures. Identify Project fair share requirements for mitigation measures. <br />b. Prepare administrative draft free-standing traffic impact study for project <br />c. After receiving comments, prepare final traffic study for project <br />d. Provide any requested review and comments on CEQA document traffic section prepared by <br />others. <br />e. Respond to CEQA document comments T&M basis. <br />Cumulative Effects <br />In accordance with CEQA Guidelines Section 15130, the EIR will address the cumulative effects of the <br />proposed project in combination with other projects. As set forth in the CECIA Guidelines, the cumulative <br />analysis will focus on impacts to which the project has made a significant incremental contribution. The <br />analysis will reflect the severity of the impacts and their likelihood of occurrence, and will be guided by <br />standards of practicality and reasonableness - <br />Alternatives <br />Pursuant to CEQA Guidelines Section 15126.6, the EIR will evaluate a range of feasible alternatives to the <br />proposed project. One of the alternatives will be the CEQA-mandated "No Project Alternative," which is <br />the circumstance under which the project does not proceed. FCS will evaluate up to two additional <br />alternatives, likely consisting of a reduction in project size or potentially a refinement of proposed <br />residential lot locations to better comply with City policies. In addition, the Alternatives section will <br />address the feasibility of an alternative location, as well as any alternatives that were initially considered <br />but rejected from further consideration. <br />NORTH AMERICA I ruROK I AFRICA I A1ISTRA1 IA I A&A <br />FIRSTCAR80NSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.