Laserfiche WebLink
s ,t.., <br /> As you are aware,with the grading of the Reznick property, any time grading and erosion control is <br /> being done in open land, there is the potential for cost overruns because of the unknown soil conditions. <br /> Therefore, we have asked for a 20%contingency should we encounter different soils conditions or the <br /> need for extra erosion control. <br /> APPROVED: <br /> d&�— <br /> Date.//-5 <br /> Nelson Fialho <br /> 2 <br />