Laserfiche WebLink
 Medians, Fire Stations & Main Street Landscape <br />Project No: PWD 26.301 <br />C.Large items of debris, such as large appliances or couches, abandoned on the <br />properties by others shall be removed to a suitable dump site by the City or by the <br />Contractor as “additional services” if approved by the City. Notify the City <br />immediately when such dumping occurs. <br />2-04 Hardscape <br />A.Street median hardscape areas shall be maintained in a neat, clean appearance. <br />Areas are to be kept weed-free. Excess dirt build-up is to be removed at least <br />semi-annually. <br />B.Park and Ride Lot hardscape areas are to be policed on Monday, Wednesday, and <br />Friday to remove litter and trash so that they are maintained in a neat, clean <br />condition. Areas are to be kept weed-free. <br />C.Fire Station hardscape areas are to be policed monthly to remove litter and trash, <br />keeping the areas neat and clean. Areas are to be kept weed-free. <br />D.Silt resulting from erosion and other landscape debris shall be removed from <br />sidewalks, gutters, and driveways. <br />2-05 Drainage Systems Maintenance <br />A.All drainage systems on the properties for purposes of rainwater or irrigation <br />water collection, whether surface swales, French drains, catch basins, dry wells, <br />creeks, or streams, shall be maintained in a clean condition free of debris, erosion <br />waste, weeds, or any blockage. Natural creeks and streams are not included. <br />B.When a drainage system is blocked by debris from off the site or by erosion <br />waste from off-site major storm damage, correction will be made by the City <br />after prompt notification by the Contractor or considered “additional services” as <br />approved by the City. <br />2-06 Erosion Control <br />The Contractor shall not be responsible for structural maintenance, repair, or replacement <br />of the following: parking areas, driveways, streets, or sidewalks, except for such <br />structural maintenance, repair, or replacement resulting from damage caused by the <br />Contractor or their agents. <br />A.Erosion resulting from failure to maintain properly rooted plant material on slopes <br />shall be the responsibility of the Contractor to correct and accomplish necessary <br />cleanups. <br />B.Erosion resulting from major storm damage that requires major slope <br />reconstruction and/or installation of additional drainage facilities shall be the <br />City’s responsibility. <br />EXHIBIT A <br />Docusign Envelope ID: 0CA1C663-FC9F-8542-829D-EE33675CC266Docusign Envelope ID: F7F9ED3E-EB07-824E-82A3-2EC213332F32