My WebLink
|
Help
|
About
|
Sign Out
COOPERATIVE AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
COOPERATIVE AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2026 12:33:44 PM
Creation date
10/14/2026 12:24:57 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/26/1991
LONG TERM AGREEMENTS - NAME
MULTIPLE AGENCIES
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7_ Traffic Engineering Programs <br />Purpose <br />The focus of this task is to develop the data base files that are used by computer programs to convert <br />FMME2 output to a format readable by traffic enginc Bring level of service programs. These files are also <br />used in the validation effort to- compare counted intersection turning movements with model -forecasted <br />turning movements_ <br />Approach and Methodology <br />The CONSULTANT shall create a turning -movement file and a geographic correspondence file for each <br />counted intersection. These files shall be used to automate the validation effort by creating a comparison <br />table of counted and EMNIFa simulated timing movements for these intersections. <br />The CONSULTANT will develop separate computer.programs to take data from F.MA E2 output adjusted <br />based on existing count data, which will be combined with descriptions of intersection geometries (suet <br />as the number of lanes for each movement, signal phasing, etc_) to perform intersection level of service <br />calculations for various level of service programs, such as the V/C program. "Me VIC program will <br />include the Furness adjustment procedure for intersection analysis- <br />-The CONSULTANT shall -perform AM and PM peak -hour level of service calculations at 80 to 85 major <br />intersections in the Tri-Valley area. These intersections include all ramp terminals and most major arterial <br />intersections within the study area. The level of service analysis will be performed for the 1990, 2000 <br />and 2010 traffic conditions. The CONSULTANT, in conjunction with the jurisdictions, will provide the <br />1990 (existing) AM and PM peak hour turning -movement counts at the selected intersections as well as <br />the intersection characteristics, such as the number of lanes, signal phasing, etc., for those intersections <br />for the existing (1990) conditions and for the two forecast years_ Individual jurisdictiues'shall be <br />responsible for analysis of the intersection. <br />End Product <br />The end product of this task will be a set of computer programs and necessary output tables showing <br />existing and projected intersection fuming movements, and level of service at intersections calculated from <br />adjusted model output. For each intersection, the_CONSULTANT shall submit all output data for review. <br />Cooperative Agreement No. 45.0100 Exhibit A <br />Between Contra Costa Transportation Authority and Page 8 of 13 <br />County of Alameda, Pleasanton, Dublin, and Livermore <br />
The URL can be used to link to this page
Your browser does not support the video tag.