My WebLink
|
Help
|
About
|
Sign Out
COOPERATIVE AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
COOPERATIVE AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2026 12:33:44 PM
Creation date
10/14/2026 12:24:57 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/26/1991
LONG TERM AGREEMENTS - NAME
MULTIPLE AGENCIES
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 11: Meetings and Project Administration <br />Purpose <br />The purposd of this task is to provide a regular basis for coordination of activities to anticipate any scope <br />or schedule changes and to document progress and performance throughout the agreement period- The <br />task also includes coordination ineelinas with the MTC, Caltrans and local jurisdictions. <br />Approach <br />Trend meetings will be held on a monthly or "as -necessary" basis with representatives of the Tri-Valley <br />Transportation Council, the Authority, and Contra Costa and Alameda County staffs, to review the status <br />of the project The existing budget will allow for eight trend meetings- For each trend inceting, the <br />CONSULTANT shall prepare the following items: <br />Agenda: The aguida should address technical issues, scope/budget issues, ftrz- <br />weeic_ horizon schedule, Master Schedule, and percent -complete versus PC=_-c":-- <br />expended- <br />Four-Week Horizon Schedule Shows key current activities and those riar r:: <br />during the next month Key activities that span beyond the month may b"_- s` *wn <br />using dates. <br />Action Items Log: Key submittals and issues, for involved parries should be, <br />shown on the Action Items Log If responses are expected, the initial due dztc <br />should be shown and the final date monitored. The log should give a continuous <br />chronology of the project from start to finish However, only the most recent <br />action items need to be attached to the agenda_ <br />• Master Schedule Shows key project activities through the completion date, with <br />emphasis on deliverables, review periods by jurisdictions/committees. and final <br />submittals at the end of the contract duration- Master schedule should be date - <br />specific and easily ulxiamble, as activities may be added or deleted. <br />Budget Status Summary- A table showing total budget, total expended. percent <br />expended, percent complete (qualitative), budget remaining by task, and total <br />budget. <br />Cooperative Agreement No_ 45.01.00 Exhibit A <br />Between Contra Costa Transportation Authority and Page 12 of 13 <br />County of Alameda, Pleasanton, Dublin, and Livermore <br />
The URL can be used to link to this page
Your browser does not support the video tag.