My WebLink
|
Help
|
About
|
Sign Out
COOPERATIVE AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
COOPERATIVE AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2026 12:33:44 PM
Creation date
10/14/2026 12:24:57 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/26/1991
LONG TERM AGREEMENTS - NAME
MULTIPLE AGENCIES
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM and daily transit ridership on BART, County Connection and LAVTA_ <br />CONSULTANT shall adjust the model to obtain forecasts that appear reasonable when compared with <br />existing data and future employment and population data_ <br />End Product <br />The product of this task will be a technical memorandum describing the approach, methodology, <br />assumptions, and results of the year 2000 and year 2010 travel demand .forecasts. <br />Task 10: Documentation <br />Purpose <br />The purpose of this task is to prepare appropriate documentation of the travel demand model, and also <br />prepare a user instructions manual for correct application of the focused Tri-Valley Model - <br />Approach and MetliodoloU <br />CONSULTANT shall prepare a Technical Report documenting the approach, methodology, assumption <br />and results of the Tri-Valley Model- The report shall include existing count data and validation records <br />in a technical appendix. <br />The Technical Report shall describe the development and validation of the travel demand modeL The <br />report shall document the nctworW7onc and Iand use assumptions, as well as the trip <br />generation/disWbution/assigament methodologies *for the Tri-Valley model step-by-step. <br />CONSULTANT shall prepare a Users' Guide to provide instructions for running the Tri-Valley Model_ <br />Included in the Guide shall be computer -;program -flow diagrams and the options and parameters used <br />when executing the travel models as well as the utilization of separate programs that will convert model <br />output to a suitable format for subsequent traffic engineering applications_ <br />End Product <br />The end product of this task will be a Technical Report and a Users' Guide for the Tri-Valley Model_ <br />Upon completion of the Tri-Valley Travel Demand model, the CONSULTANT shall deliver all the <br />and the Tri-Valley jurisdictions_ <br />hardware and sofiwarc to flue location designated by the Authority in conjunction with Alameda Counties <br />Cooperative Agreement No. 45.01.00 Exhibit A <br />Between Contra Costa Transportation Authority and Page 11 of 13 <br />County of Alameda, Pleasanton, Dublin, and Livermore <br />
The URL can be used to link to this page
Your browser does not support the video tag.