Laserfiche WebLink
rodenticide sl~all be used. Application methods for chemicals should minimize exposure <br /> of non-target[species as recommended in the FEIR. Prior to application, the operator <br /> shall conduc~ a field consultation with the FWS and DFG regarding the feasibility of <br /> rodenticide a~plication. The operator shall comply with FWS and DFG requirements for <br /> such applicatlon. <br /> <br />23. The operator Ishall, to the extent feasible, locate stockpiles in previously disturbed areas. <br /> The operator Shall also attempt to minimize the area extent (footprint) of the stockpiles. <br /> <br />24. To the extent possible, project-related vehicle traffic shall be restricted to established <br /> roads, consmlction areas, storage areas, and parking areas. To the extent possible, off- <br /> road vehicle t~'affic outside of designated project areas shall be restricted. Project-related <br /> vehicles shalll observe a 20 mph speed limit in all project areas. <br /> <br />25. The operator Ishall conduct an employee education program. The program shall include <br /> review of kit fox biology, habitat requirements, legislative protection, and measures taken <br /> to reduce ]ml:mCts to the species during project construction and operation. <br /> <br />26. The operator '!shall submit a post-construction compliance report to FWS within 45 days <br /> of completio~ of each major project component (e.g., stockpiles, water pipeline, storm- <br /> drain basin COnstruction). <br /> <br />27. Closed landfiil areas may be provided as part of the replacement mitigation habitat for the <br /> San Joaquin l~it fox and various passerine species, if literature research or available data <br /> establishes thht this is feasible and if approved by FWS and DFG. <br /> <br />WETLANDS <br /> <br />28. The operator! shall implement a Wetlands Mitigation Plan based on the Conceptual <br /> Wetland Mitigation Plan (LSA, 1994), the mitigation measures identified in the FEIR, <br /> and a Plan tl~3t has been approved through permits by the COE, FWS, DFG, RWQCB <br /> and the Cotmty. At minimum, this shall include creation of 2.5 acres of seasonally <br /> inundated w~tlands in four units in Section 17. The wetlands shall be designed as <br /> breeding habitat for the California tiger salamander and red-legged frog. Revegetation <br /> shall use only native vegetation of species found on site. The plan shall include <br /> performance ~md monitoring standards. <br /> <br />29. The operator! shall monitor the replacement wetlands after they are created to assess <br /> whether they m'e meeting performance approved Mitigation <br /> the <br /> standards <br /> in <br /> the <br /> Wetlands <br /> Plan. Such n~onitoring shall be conducted for five years or until performance standards <br /> are met, whichever occurs first. <br />30. If pefformange standards are not met during the first five years after replacement <br /> wetlands are Created, the operator shall continue monitoring for a period to be determined <br /> by the COE aBd County. <br /> the <br /> <br />31. Maintenance iand momtonng of the wetlands shall be the responsibility of the operator <br /> with the assisltance of qualified consultants, until it can find a qualified or private <br /> agency <br /> <br /> 3 <br /> Final Altamont Settlement ~ Exhibit B <br /> <br /> <br />