Laserfiche WebLink
organization lo assume that responsibility. The management entity shall be selected <br /> based on ~ts ~tnancial and technical capability to can'~ out the long-term maintenance <br /> requirementsI and iXs eonunitment to goals consistent with the long-term maintenance. <br /> Selection of the management entity shall be subject to approval by the COE and the <br /> County. If ~ management entity is approved, the management entity, through a legally <br /> binding agreement, shall assume the maintenance and management responsibility of the <br /> wetland mitigation areas in perpetuity. <br /> <br />32. The operatori shall avoid existing ponds in the Phase I landfill area until replacement <br /> wetlands ha~e been established. The operator may remove the existing ponds as <br /> construction 9ccurs in the expansion area after it has been determined that replacement <br /> wetlands have: been established and the California tiger salamander has been resettled. <br /> <br />ALKALI SINK <br /> <br />33. The operaturishall implement a mitigation plan for the alkali sink that is based on the <br /> Conceptual .~etlands Mitigation Plan (LSA, 1994) and the mitigation measures identified <br /> in the FEIR, I and that has been approved by the COE, DFG, FWS, and the County. <br /> Operator shall conduct a site-speeific hydrology analysis for the sink to determine the <br /> appropriate a~/erage seasonal fiow to the sink, and this shall be incorporated into the plan. <br /> The mitigatiOn plan shall include performance and monitoring standards. <br /> <br />34. The operato~ shall conduct bi-annual monitoring of the alkali sink pursuant to a <br /> monitoring Plan approved the COE, DFG, FWS, and the County to determine whether the <br /> performance ~tandards are being met. If the monitoring reports show that the alkali sink <br /> is not being !adequately maintained or is declining in habitat quality or quantity, the <br /> operator shall~ take additional mitigation measures approved by the COE, FWS, DFG, and <br /> the County, based in part on measures recommended in the FEIR. <br /> <br />35. Any surface pr ground water delivered to the alkali sink shall pass through detention <br /> basins to remove sediment, and untreated leachate delivered into the alkali sink shall <br /> meet applical:[le water quality standards. <br /> <br />36. The operator ~hall fence the area to keep livestock out of the alkali sink. <br />GEOLOGY/SOILS/~EISMIC <br /> <br />37. The operatorlshall design and construct the landfill in accordance with Titles 14 and 23 <br /> of the California Code of Regulations (CCR) requirements for final cover design, final <br /> surface gradqs, and continuing monitoring and maintenance to reduce potential impacts <br /> due to settler~ent. The final design and subsequent modifications shall be reviewed by <br /> the RWQCB !(prior to issuance of revised Waste Discharge Requirements) and the LEA <br /> (as part of tile application for a revised Solid Waste Facilities Permit). RWQCB and <br /> LEA approvals shall signify that the proposed design meets all of the applicable <br /> requirements~ <br /> <br />38. The operatori shall conduct slope stability analyses for the design in accordance with <br /> Titles 14 and 23 of the CCR and stability shall be verified for each landfill cell and <br /> <br /> 14-B <br /> Final A~tarnont Settlement - Exhibit B <br /> <br /> <br />