My WebLink
|
Help
|
About
|
Sign Out
SR 05:135
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2005 3:41:50 PM
Creation date
5/20/2005 3:28:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/24/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6 <br /> Existing, 2010 and 2025 Traffic Volumes with Feasible Mitigations Identified for Selected Intersections <br /> <br /> Stoneridge Drive at Springdale Avenue <br /> <br /> Existing Development (2003) & Existinq Roadway Network (LOS & Seconds of Delay) <br /> <br /> Peak Hour Control Intersection I Eastbound Westbound Northbound Southbound <br /> AM Signal B 11 B 17 A 5 B 13 C 23 <br /> PM Peak Hour Signal B 19I C 23 A 9 B 14 C 34 <br /> Mitioation Measures <br /> <br /> Approved Development (2010) & Approved Roadway Network <br /> <br /> Peak Hour Control Interseotion Eastbound Westbound Northbound Southbound <br /> None currently approved AM Signal C 21 C 24 C 21 B 13 C 27 <br /> PM Peak Hour Signal 45 C 33 58 B 17 ~i~D : 40 <br />Proposed Mitigation: <br />The West Las Positas Interchange would <br />improve aocess to homes south of this <br />intersection. <br />Restripe southbound to provide a double left Aooroved Develooment ¢2010~ with Proposed Mitiqations <br />[um and shared through/right lane. Peak Hour Control Intersection Eastbound Westbound Northbound Southbound <br />Eliminate the east crosswalk and unsplit the AM Signal B 17 C 22 B 15 B 15 C 24 <br />north/south signal phasing. PM Peak Hour Signal C 28 C 33 C 25 C 26 C 32 <br /> <br />Proposed Mitigation: Anoroved Development (20t 0) with Proposed MitiRations + 2025 Reqional Traffic <br /> <br />Same as Proposed Above AM Peak Hour ControIsignal IntersectionB 17 EastboundB 19 WestboundB 15 NorthboUndB 12 Southboundc 20 <br /> PM Peak Hour Signal C 29 C 30 C 29 C 20 C 30 <br /> <br /> 39 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.