My WebLink
|
Help
|
About
|
Sign Out
SR 06:060
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2007 4:06:08 PM
Creation date
2/15/2006 4:39:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3909 Vineyard Avenue Environmental Checklist <br /> <br />Discussion <br /> <br />a-c) The area has been considered for some time as a desired location for a high density <br />residential development. Build out of the area does not constitute direct or indirect <br />growth inducing impacts for the City of Pleasant on. The proposed project will not <br />di.splace substantial numbers of people or requiring replacement housing be provided. <br />Therefore, this would be categorized as no-impact. <br /> <br />13. PUBLIC SERVICES <br /> <br />Environmental Setting <br /> <br />The City of Pleasanton has public services and infrastructure planned to meet the build out of the <br />General Plan, implemented by the Growth Management Plan. <br /> <br />Standards of Significance <br /> <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br /> <br />. Create an increase in demand for police protection services which could substantially <br />interfere with the ability of the Police Department to provide adequate response time to <br />the project site; <br />. Create an increased demand for fire protection services that would substantially interfere <br />with the ability of the Fire Department to provide adequate response time to the project <br />site; <br />. Crease an increased demand for schools that would exceed existing school capacity; or, <br />. Create an increased demand for parks and other public facilities that would exceed <br />existing capacity. <br /> <br />Issues <br /> <br />Potentially <br />Significant <br />Impact <br /> <br />Less Than <br />Significant <br />With Mitigation <br />Incorporated <br /> <br />Less Than <br />Significant <br />Impact <br /> <br />No <br />Impact <br /> <br />Public Services <br />Would the project: <br /> <br />a) Would the project result in substantial adverse <br />physical impacts associated with the provision of <br />new or physically altered governmental facilities, <br />need for new or physically altered governmental <br />facilities, the construction of which could cause <br />significant environmental impacts, in order to <br />maintain acceptable service ratios. response <br /> <br />D <br /> <br />D <br /> <br />~ <br /> <br />D <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.