My WebLink
|
Help
|
About
|
Sign Out
SR 06:060
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2007 4:06:08 PM
Creation date
2/15/2006 4:39:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3909 Vineyard Avenue Environmental Checklist <br /> <br /> Less Than <br /> Potentially Significant Less Than <br /> Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Transportation and Traffic <br />Would the project: <br />a) Cause an increase in traffic which is substantial in 0 0 ~ 0 <br /> relation to the existing traffic load and capacity <br /> of the street system (i.e., result in a substantial <br /> increase in either the number of vehicle trips, the <br /> volume to capacity ratio on roads, or congestion <br /> at intersections)? <br />b) Exceed, either individually or cumulatively, a 0 0 ~ 0 <br /> level of service standard established by the <br /> county congestion management agency for <br /> designated roads or highways? <br />c) Result in a change in air traffic patterns, including 0 0 ~ 0 <br /> either an increase in traffic levels or a chan~e in <br /> location that results in substantial safety ris s? <br />d) Substantially increase hazards due to a design 0 0 ~ 0 <br /> feature (e.g., sharp curves or dangerous <br /> intersections) or incompatible uses (e.g., farm <br /> equipment)? <br />e) Result in inadequate emergency access? 0 0 ~ 0 <br />f) Result in inadequate parking capacity? 0 0 ~ 0 <br />g) Conflict with adopted policies, plans, or programs 0 0 ~ 0 <br /> supportin~ alternative transportation (e.g., bus <br /> turnouts, icycle racks)? <br />Discussion <br /> <br />The proposed project was initially required to prepare a traffic study to assess the impacts this <br />project would have on the intersections in close proximity as well as others within the City. In <br />review of the traffic data collected for the proposed project, the City Traffic Engineer determined <br />that this project could share the findings of the traffic analysis performed for the Bernal <br />Commercial Development located at off Bernal Avenue north of Nevada Street, as the traffic <br />analysis covers the intersections need to be studied for the proposed residential development. <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.