My WebLink
|
Help
|
About
|
Sign Out
SR 06:060
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2007 4:06:08 PM
Creation date
2/15/2006 4:39:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The 1996 General Plan includes the widening of Bernal Avenue to provide a third southbound <br />lane. This new lane should be striped as a right turn only lane and should be constructed at <br />the time the vacant property on the northwest corner is developed. <br /> <br />Bernal Avenue at Foothill Road <br />Mitigation - Widen Bernal Avenue to 4 lanes <br />The 1996 General Plan includes the widening of Bernal Avenue to 4 lanes between Foothill <br />Road and 1-680. The Year 2025 scenarios that include some of the 1996 General Plan road <br />widenings assume that there are two continuous westbound lanes approaching Foothill Road. <br /> <br />Bernal Avenue at 1-680 Northbound Ramps <br />Mitigation - Widen Bernal Avenue to 4 lanes <br />About 50% of westbound traffic on Bernal Avenue turns left onto the southbound 1-680 on- <br />ramp. This volume exceeds the capacity of the left turn pocket and causes too much traffic to <br />all use the #1 through lane at the intersection of the northbound 1-680 ramps. The Year 2025 <br />scenarios that include some of the 1996 General Plan road widenings assume that the existing <br />#1 westbound through lane is restriped as the #2 westbound left turn lane and that the on- <br />ramp is widened to accept two lanes. <br /> <br />Bernal Avenue at Kottinqer Drive <br />Mitigation - Construct new traffic signal <br />In all Year 2025 scenarios, the flow of traffic along Bernal Avenue exceeds the capacity of the <br />stop sign controls at this intersection, resulting in LOS F conditions on Bernal Avenue, Stop <br />sign controls have far less capacity than traffic signal control. This was recently demonstrated <br />at Vineyard Avenue at Montevino Drive where traffic backups were eliminated when the signal <br />replaced the previous 4-way stop. Installing a traffic signal at this intersection would improve <br />pedestrian safety, while reducing delay for Pleasanton residents. The 1996 General Plan <br />shows this intersection as a future traffic signal location. <br /> <br />Bernal Avenue at Main Street <br />Mitigation - Construct new traffic signal <br />In all Year 2025 scenarios, the flow of traffic along Bernal Avenue becomes so continuous, that <br />not enough gaps are available for drivers on Main Street to turn left or right at the intersection. <br />The extreme delay on Main Street creates LOS F conditions at the intersection. Installing a <br />traffic signal at this intersection would improve pedestrian and traffic safety, while reducing <br />delay for downtown visitors. The 1996 General Plan shows this intersection as a future traffic <br />signal location. Computer simulations show that the signal can be coordinated with other <br />signals along Bernal Avenue to minimize stops and delay. <br /> <br />Bernal Avenue at Meadowlark Drive <br />Mitigation - Widen Bernal Avenue to 4 lanes <br />The 1996 General Plan includes the widening of Bernal Avenue to 4 lanes between Foothill <br />Road and 1-680. The Year 2025 scenarios that include some of the 1996 General Plan road <br />widenings assume that there are two continuous east and westbound lanes approaching this <br />intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.