My WebLink
|
Help
|
About
|
Sign Out
RES 97073
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1997
>
RES 97073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2012 1:26:15 PM
Creation date
11/6/1998 6:21:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br /> MARTIN AVENUE/CAMERON AVENUE BICYCLE/PF~D~ PATFIg <br /> <br /> PROJECT <br /> LOCATION <br /> <br />PROJECT DESCRIPTION: Eight (8') wide bicycle/pedestrian path for 3,200 feet on the east side of Martin <br />Avenue ($65,000) from Amaral Park to Mohr Avenue and on Cameron Avenue ($30,000) 1,400 feet from <br />Palmet Drive to Martin Avenue. <br /> <br />PROJECT JUSTIFICATION: Pedestrian and bicycle access to Mohr School is limited since there are no <br />sidewalks and minimal pavement width on both streets. Possible reimbursement for most of Martin Avenue path <br />costs could be recovered from the proposed development on the Busch property. Martin Avenue path requires <br />an easement from Kaiser and Cameron Avenue an easement from Lands of Lehman. (No easement costs are <br />shown) <br /> <br /> PROJECT COST ESTIMATE <br /> Item Cost Funding Source <br /> Engineering $10,000 General Fund $95,000 <br /> Construction 70,000 <br /> Contingency 10.000 <br /> Construction Services 5,000 <br /> TOTAL $95,000 <br />CIP #: 978064 CATEGORY: Miscellaneous/Streets STATUS: Funded FY 1997/98 <br />(CIPBIKE.97) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.