Laserfiche WebLink
Attachment D <br /> <br /> MAIN STREET BRIDGE SEISMIC RETROFIT <br /> <br />PROJECT DESCRIPTION: This project includes the seismic retrofit of the Main Street Bridge over the <br />Arroyo Del Valle. This project is not expected to significantly affect traffic over the Main Street Bridge. <br />PROJECT JUSTIFICATION: This is a new project. The Main Street Bridge was identified by the State as <br />one of the bridges under the Mandatory Statewide Seismic Retrofit Program. <br />PROJECT COST ESTIMATE <br /> Item Cost Funding Source <br /> Engineering $30,000 HBRR Funds $239.000 <br /> Construction $200.000 State Matching Seismic Fund $31,000 <br /> Contingency $20.000 <br /> Construction Services $20.000 <br /> Total $270.000 Total $270,000 <br />CIP #: 975062 CATEGORY: Streets STATUS: Funded FY 1997/98 <br />(CIPMSB.97) <br /> <br /> <br />