Laserfiche WebLink
Another important requirement in fire suppression is adequate fire flow which is <br /> the amount of water, expressed in gallons per minute, available to control a given <br /> fire. The total fire flow needed to extinguish a given fire is a function of building <br /> construction, occupancy, area, and height; fire loading; and distance between <br /> buildings. The City's Fire Department uses the Insurance Services Office (ISO) <br /> rating system for determining necessary fire flow. Fire flow for a given building <br /> is totally dependent on a reliable water supply, standards for which are set <br /> nationally and by the City in its Design Guide. Pleasanton's fire flow is adequate <br /> throughout the City with a few exceptions, including portions of the Southeast <br /> Hills. Measures to mitigate problems in these areas include the addition of <br /> sufficient reservoirs and/or water mains and hydrants or built-in fire protection <br /> systems, such as automatic fire sprinklers. <br /> <br /> 5. Streets and Highways <br /> <br /> Pleasanton is served by the Bay Area Rapid Transit (BART) line as well as by an <br /> extensive roadway network which includes freeways, arterials, collectors, and local <br /> streets. In addition, the City maintains a major bike and trail system. It also maintains <br /> a Dial-A-Ride service for senior and handicapped residents, and is served by a <br /> comprehensive bus system. <br /> <br /> In order to accommodate buildout of the General Plan, a wide range of street, highway, <br /> and intersection improvements must be constructed in a timely fashion. Many roadway <br /> improvements were installed prior to development of major business parks in North <br /> Pleasanton resulting in the uncongested Levels of Service in Pleasanton today. <br /> Improvements must continue to be installed prior to large amounts of residential and <br /> employment growth or congestion will result. Therefore, the time of improvements must <br /> be coordinated with anticipated occupancies of large residential and commercial projects <br /> in order for acceptable Levels of Service to be maintained. <br /> <br /> In order to make roadway improvements effective, additional traffic mitigations need to <br /> be installed. Traffic signals, for example, are a critical mechanism to ensure the safest <br />.. and most efficient flow of traffic. <br /> <br /> The City has established a computerized traffic monitoring and signalization system to <br /> enable automatic tabulation of traffic counts and Levels of Service as cars pass over <br /> sensors built into City intersections. This system is fully operational. The system <br /> provides a reliable check against annual traffic counts. <br /> <br /> Transportation Systems Management (TSM) is a broad term referring to the efficient use <br /> of all types of transportation but usually includes non-roadway improvements measures <br /> such as ridesharing, flextime, bicycling, walking, telecommuting, and other means to <br /> reduce automobile trips. The City of Pleasanton adopted the first city-wide TSM <br /> ordinance in the nation. The TSM ordinance assists employers in reducing peak-hour <br /> <br /> 10 <br /> <br /> <br />