My WebLink
|
Help
|
About
|
Sign Out
RES 95024X
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1995
>
RES 95024X
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 11:10:33 AM
Creation date
2/25/1999 5:48:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/21/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended mprovement Ran <br /> <br /> Based on the results of the alternatives testing, the TAC and the TVTC decided to <br /> focus the ultimate improvement plan on the arterial corridors within Tri-Valley rather <br /> than the Tri-Valley gateways. The plan must address the primary question: What can <br /> we do to achieve the best level of service within the Tri-Valley? . <br /> <br /> Three contributing factors influence the ability to respond to this question. <br /> <br /> · Financial constraints. <br /> · Physical limitations within corridors. <br /> · Development pattern. <br /> <br /> Financial resources for all projects are limited. The Measure C and Measure B sales <br /> tax programs provide substantial funding for specific projects in Tri-Valley. Other <br /> projects must compete for the relatively small pot of public funds. Developer fees, <br /> which have an upper limit, could help supplement public funds. Future sales tax or <br /> gasoline tax initiatives may or may not be successful. <br /> <br /> Expansion of major corridors within Tri-Valley is limited due to existing development <br /> and terrain. These limitations hinder the development of transportation corridors <br /> other than the existing 1-680 and 1-580 corridors. <br /> <br /> Development patterns within Tri-Valley have been geared toward relatively low <br /> housing and commercial densities. These patterns are expected to continue in the <br /> future. This development pattern is impossible to serve thoroughly with transit, given <br /> realistic funding expectations. <br /> <br />~ Barton-Aschrnan Associates, Inc. 122 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.