Laserfiche WebLink
Recommended Improvement Plan -- <br /> <br /> Plan Overview <br /> <br /> The-TVTAC used the policy direction to create a set of actions comprising ~n integrat- -- <br /> ed plan. The transportation plan comprises enhancement to roadway capacity coupled <br /> with increased transit service, control of demand (growth management and TDM), and <br /> acceptance of congestion in locations where it csnnot be avoided. The plan is financial- -- <br /> ly constrained in that it includes only elements that are already funded, likely to be <br /> funded given extension of federal and state programs, or fundable by new development <br /> at an affordable level. Chapter 8 describes the financing plan. _ <br /> <br /> The following sections provide an overview of the plan. <br /> <br /> Road Improvements <br /> <br /> The plan includes many improvement projects for freeways, interchanges, arterials, <br /> and intersections. These are all based on the reality of gateway constraints. <br /> <br /> Gateway Constraints. Analysis of alternatives through the planning process showed <br /> that the TVTC's best interests would not be served by widening any of the gateways <br /> for single-occupant vehicles leading into the area. The gateways include 1-680 north <br /> and south, 1-580 east and west, Crow Canyon Road to Castro Valley, and Vasco Road. <br /> Widening of these gateways would still leave the freeways congested, would lead to ' <br /> more through traffic, and would increase traffic volumes on other Tri-Valley roads. <br /> This is true because of the Tri-Valley's strategic location between San Joaquin County <br /> and the Bay Area ~nd also between Central and Eastern Contra Costa County and " <br /> Santa Clara CounLy. <br /> <br /> The implication of gateway constraints for roadway planning is that the interior <br /> freeways and arterials sh,::ald be sized to handle only what traffic can get through the <br /> gateways. Thus, the plan recognizes that congestion will occur for several hours each <br /> weekday at the gateways, but this will · :~ve the positive effect of metering single- - <br /> occupant vehicle travel to and from the area. Within the Tri-Valley area, the road <br /> system is designed to minimize congestion. While not ideal (the ideal would be to have <br /> no congestion anywhere), the roadway plan when combined ~th a balance between -- <br /> jobs and housing, produces the best conditions to be reasonably expected. <br /> <br /> The reasons behind the gateway constraint concept are different for different gate- _ <br /> ways, as discussed below: <br /> <br /> 1-680 North. The section north of Diablo Road cannot practically be widened _ <br /> beyond the HOV lanes under construction. The gateway constraint assumption <br /> recognizes this reality. <br /> <br /> 1-680 South. The section south of Route 84 has room to be widened, and limited <br /> widening would support the investment in Route 84 capacity. Accordingly, the <br /> plan recommends the addition of HOV lanes (see Chapter 7). Gateway constraints <br /> would still apply for single-occupant vehicles. ' <br /> <br />Barton-Aschman Associates, Inc. 123 ' <br /> <br /> <br />