Recommended Improvement Plan <br /> <br /> The Tri-Valley Transportation Plan includes r~rnp metering with HOV bypass with <br /> the proviso that this not seriously impact local streets and that local implementation <br /> be tied with implementation along all of 1-680 and 1-580 in neighboring communities. <br /> <br /> Freeway HOV Lanes. High Occupancy Vehicle (HOV) lanes are under construction <br /> along 1-680 between Rudgear Road and 1-580. HOV lanes provide the advantage of <br /> reducing travel times for ridesharers and transit patrons. They also enhance mobility <br /> during off-peak hours by being available for all vehicles. This is especially important <br /> when considering truck traffic, which increasingly relies on off-peak hours to reach <br /> destinations without undue delays. <br /> <br /> The TVTC recognizes the benefits of HOV lanes, but realizes that take-a-lane pro- <br />" grams do not work. Such an ill-fated attempt at providing HOV lanes on 1-580 <br /> resulted in federal legislation prohibiting their use on that freeway in unincorporated <br /> areas. Thus, HOV lanes must be added to the freeways. <br /> <br /> HOV lanes on both 1-680 and 1-580 are included in the plan. Due to the expense of the <br /> projects, however, some segments are included as lower priority projects. 1-680 south <br />'-- of 1-580 has been designed to accommodate the addition of HOV lanes, but pavement <br /> widening would be required. Top funding priority should be given to the section south <br /> of Route 84 to the top of the Sunol Grade, which is the border of Area 4 in the <br /> Alameda Countywide Transportation Plan. This section will experience significant <br /> traffic increases due to the planned capacity increases to Route 84. The section of <br /> 1-680 between Alcosta Boulevard and Route 84 should also be planned to include HOV <br /> lanes but with a lower funding priority. <br /> <br /> On 1-580, HOV lanes would be more difficult and costly to build because the inter- <br />-- changes have not been built to accommodate them. However, the Caltrans Route <br /> Concept calls for 10 lanes plus BART in the median for 1-580. The most important <br /> segment for funding priority on 1-580 is the segment between Tassajara Road and <br /> North Livermore Avenue. This segment is predicted to experience the highest traffic <br /> demand along 1-580 in the Tri-Valley. To accommodate the extra freeway width, the <br /> interchanges at E1 Charro/Fallon and Airway would need to be rebuilt. The El Charco/ <br /> Fallon interchange is planned to be rebuilt anyway. In addition, the planned new <br /> interchange at Isabel Avenue (Route 84) would need to be built to accommodate the <br /> width. As a lower funding priority, the plan also includes extending the 1-580 HOV <br /> lanes east to the Ai~meda County border. This would require widening four <br /> interchanges in Livemore (N. Livemore, First, Vasco, and Greenville), and three <br /> interchanges/crossings east of Livermore. <br /> <br /> Extending HOV lanes on 1-580 west of Santa Rita Road is more problematic. With the <br /> BART extension and the 1-580/I-680 interchange project, this section will be built out <br /> to its full Route Concept width of 10 lanes plus BART. The section will have four <br /> through lanes, as it does today, plus auxiliary lanes between interchanges. Thus, HOV <br /> lanes on 1-580 west of Santa Rita are not included i_n the plan. <br /> <br />~- Barton-Aschman Associates, Inc. 126 <br /> <br /> <br />