Laserfiche WebLink
· .- Rnancial Plan <br /> <br /> 1. The project must involve a route of regional significance as defined by the TVTC <br /> for the transportation plan (see Figure 1-1). <br /> <br /> 2. Transit projects can be included. <br /> <br /> 3. The project must be identified in an adopted plan. <br /> <br /> 4. The project would not be built as a direct developer improvement. <br /> <br /> While not a part of the originally adopted list, a fifth criterion discussed by the TVTC <br /> is that the project should serve more than one jurisdiction. <br /> <br /> By these criteria, the following planned projects would qualify as being regionally <br /> significant. These have been preliminarily determined to be of highest priority for <br /> funding due to their demonstrated need in meeting the transportation service objec- <br /> tives through 2010. <br /> <br /> 1. 1-580/1-680 Interchange. Southbound-to-eastbound flyover. <br /> <br /> 2. Route 84. Four lanes on Vallecites Road, six lanes on Isabel Avenue, including a <br /> new interchange at 1-580/IsabeL <br /> <br /> 3. 1-680 Auxiliary Lanes. From Diablo Road to Bollinger Canyon Road. <br /> <br /> 4. BART Extension. From Castro Valley to East Dublin, including two stations in the <br /> Tri-Valley. <br /> <br /> 5. 1-580 HOV Lanes. From Tassajara Road to North Livemore Avenue. <br /> <br /> 6. 1-680 HOV Lanes. From Route 84 to top of Sunol Grade. <br /> <br /> 7. Ramp Metering. Add ramp metering with HOV bypass to all freeway interchanges <br /> in the Tri-Valley. <br /> <br /> 8. 1-680/Alcosta Interchange. Capacity improvements including replacement of <br /> southbound off-ramp with hook ramp. <br /> <br /> 9. 1-580/Foothill Interchange. Conversion to partial cloverleaf design. <br /> <br /> 10. Crow Canyon Road Safety Improvements. Realigning the roadway, construction of <br /> shoulders and improving sight distance, all aimed at improving traffic flow and <br /> safety on Crow Canyon Road between Bollinger Canyon Road and one mile north <br /> of Norris Canyon Road. <br /> <br /> 11. Vasco Road Operational Improvements. Realignment and upgrading of Vasco Road <br /> from the Alameda County line to the Livemore City limit, while retaining the <br /> two-lane cross-section. <br /> <br /> Barton-Aschman Associates, Inc. 150 <br /> <br /> <br />