Laserfiche WebLink
Rnandal Plan <br /> <br /> three categories: (1) Highways and Arterials, (2) Transit, and (3) Trails. In addition <br /> there are five programs included within Measure C: (1) Elderly and Handicapped <br /> Transit Service, (2) Local Street Maintenance and Improvements, (3) Carpools, <br /> Vanpools and Park-and-Ride Lots, (4) Bus Transit Improvements and Coordination, <br /> and (5) Regional Transportation Planning and Growth Management. Approximately 70 <br /> percent of the revenues are allocated to capital improvement projects and 30 percent <br /> to programs. The seven-year "Strategic Plan" provides detailed specific commitments <br /> for specific projects. The balance of the program is represented as 1,rnp sum amounts <br /> shown by year. The current "Strategic Plan" is detailed through fiscal year 1997. It is <br /> updated every two years and is currently undergoing its first update. Tri-Valley <br /> projects identified by CCTA for Measure C funding to date include the following. The <br /> total Measure C funding in Tri-Valley is $27.4 million. <br /> <br /> · 1-680 Auxiliary Lanes: $10 million to construct auxiliary lanes between Diablo <br /> Road and Bollinger Canyon Road interchanges. Other sources must contribute $27 <br /> million. (Source: Regional .Transportation Plan, MTC.) <br /> <br /> · Construct Fostoria Parkway Overcrossing: $11.5 million to construct the 1-680 <br /> overcrossing. Other funding sources amount to $1.8 million. (Source: CCTA, 1993 <br /> Congestion Management Progrsm, Appendix E.) <br /> <br /> · Arterial Street Improvements: $5.9 million to modify/improve the arterial road <br /> network in Tri-Valley. (Source: CCTA, 1993 Congestion Management Program, <br /> Appendix E.) <br /> <br /> Private Funding <br /> <br /> The majority of the arterial system and interchange improvements in the Tri-Valley <br /> will be built or funded by new development. This is reflective of the fact that the <br /> arterial extensions and widenings are to build additional capacity to serve new <br /> development. The new roads and widenings will either be built directly by the <br /> developers or will be paid for through local traffic impact fees. Livemore, Pleasanton, <br /> Danville, and San R~mon all have development fees. These fees will in a large <br /> measure fund the needed arterial infrastructure for the expected year 2010 transporta- <br /> tion system. However, there are 11 critical regional projects that either lack funding <br /> entirely or are not completely funded. The need for these projects cannot be tied to any <br /> single development or even any single city. These are described below. <br /> <br /> Crificol !~egionol Projects <br /> <br /> Since most arterial improvements and extensions are local-serving and will be paid for <br /> by new development, the financial plan needs to focus on the funding of the larger <br /> projects with regional significance If the developer-funded, assumed local arterial <br /> improvements are not built, changes to the financing plan would be necessary. The <br /> TVTC developed the following list of criteria to define projects for inclusion in a <br /> potential regional impact fee program: <br /> <br />Barton-Aschman Associates, Inc. 149 <br /> <br /> <br />