Laserfiche WebLink
Financial Plan ' <br /> <br /> corridor, including transit. The City of Livermore and the Alameda County CMA have <br /> adopted resolutions opposing a private toll road in the Route 84 corridor. A public toll <br /> road-has also been discussed, although no offidal positions have been taken. Because <br /> of the uncertain nature of the Mid-State Toll Road, either public or private, it is not <br /> included as a funding source for the Tri-Valley Transportation Plan. Nevertheless, it <br /> must be recognized that $137 million of the unfunded portion of the plan is attribut- <br /> able to Route 84. If the decision were made to adopt and build a toll road within the <br /> 2010 horizon of this plan, the proposed regional impact fee could be reduced, or the <br /> $137 million could be applied to one of the second priority regional projects discussed <br /> in the next section. This assumes that none of the $137 million would be needed to <br /> provide the required free roadway in the toll road corridor. <br /> <br /> Potential Future Transportation Projects <br /> <br /> The plan identifies three regional transportation projects that would be desirable for <br /> the area but are not required to meet transportation service objectives: high-occupancy <br /> vehicle lanes on 1-680 between Alcosta and Route 84, high-occupancy vehicle lanes on <br /> 1-580 between North Livermore Avenue and the San Joaquin County line, and the <br /> addition of a northbound to westbound flyover ramp at the 1-580/I-680 interchange. If <br /> more transportation funds become available than were assumed in this plan, the <br /> TVTC would like them to be allocated to these projects. <br /> <br /> Table 8-7 provides preliminary cost estimates for these projects. In current dollars the <br /> total cost would be $245 million. <br /> <br /> Table 8-7 <br /> Cost Estimates for Second Priority Regional Projects <br /> <br /> Cost <br /> (millions of <br /> Project current dollars) <br /> <br /> 1-580 HOV Lanes $85 <br /> (N. Livermore Avenue to San Joaquin Cc,jnty Line) <br /> 1-680 HOV Lanes 40 <br /> (AIcosta to Route 84) <br /> 1-580/I-680 Interchange-- 120 <br /> NB to WB Flyover Ramp <br /> Total $245 <br /> <br />Barton-Aschman Associates, Inc. 159 <br /> <br /> <br />